FieldProspects

Naturgy

Power developer3 projects on record Data as of

Naturgy has 2 planned power projects totaling 196 MW and 1 operating project totaling 210 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 3 states and 2 technologies.

196MW
planned, 2 projects
210MW
operating, 1 project
196MW
interconnection agreement signed, 100% of planned
90MW
under construction, 1 project
0MW
past due, 0 projects
3
states
Map

Where Naturgy's planned pipeline sits

Planned MW by state. The 2 largest states hold 196 MW of the 196 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Kentucky106 MW1 project, 54% of planned
  2. Ohio90 MW1 project, 46% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
0.9MW planned

for every MW Naturgy operates today. Solar + Storage (Hybrid) is most of the gap.

PlannedOperating
Solar + Storage (Hybrid) 106 MW
none
Solar 90 MW
210 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar + Storage (Hybrid)1106 MW00 MW
Solar190 MW1210 MW

MW by technologySolar + Storage (Hybrid) has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed196 MW, 100%
2 of 2 planned projects (100%)
Under construction90 MW, 46%
1 of 2 planned projects (50%)
Past due0 MW, 0%
0 of 2 planned projects (0%)
0% of Naturgy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Naturgy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
050100150 Snapshot year 90 MW 2026 2027 106 MW 2028
View as table
YearProjectsMW
2026190 MW
202700 MW
20281106 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Naturgy's planned MW sits entirely in PJM Interconnection.

Figure 2

Planned MW by grid operator

2 planned projects

PJM Interconnection 196 MW 2 projects
View as table
GridPlanned projectsPlanned MW
PJM Interconnection2196 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2020 was the biggest year.

050100150 106 MW 2020
View as table
Queue yearProjectsMW
20201106 MW
Source. 1 project without a queue date is left out MW

Naturgy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Naturgy ranks 531 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
531 Naturgy this page 2
196 MW
1
210 MW
1.07

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Naturgy

Every Naturgy project

All 3 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: NaturgySort: MW, largest first 3 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
3 projects and 406 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Naturgy

We email you when Naturgy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Naturgy project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.