FieldProspects

Nadara

Power developer1 project on record Data as of

Nadara has 1 planned power project totaling 101 MW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 15 contacts at the company are on file.

101MW
planned, 1 project
0MW
operating, 0 projects
101MW
interconnection agreement signed, 100% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
15
contacts on file
Map

Where Nadara's planned pipeline sits

Planned MW by state. Everything sits in California.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. California101 MW1 project, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
101 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Battery Storage 101 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage1101 MW00 MW

MW by technologyBattery Storage has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed101 MW, 100%
1 of 1 planned project (100%)
Under construction0 MW, 0%
0 of 1 planned project (0%)
Past due0 MW, 0%
0 of 1 planned project (0%)
0% of Nadara's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Nadara's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
050100150 Snapshot year 2026 2027 2028 101 MW 2029
View as table
YearProjectsMW
202600 MW
202700 MW
202800 MW
20291101 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Nadara's planned MW sits entirely in California ISO (CAISO).

Figure 2

Planned MW by grid operator

1 planned project

California ISO (CAISO) 101 MW 1 project
View as table
GridPlanned projectsPlanned MW
California ISO (CAISO)1101 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2021 was the biggest year.

050100150 101 MW 2021
View as table
Queue yearProjectsMW
20211101 MW
Source. Every planned project has a queue date MW

Nadara against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Nadara ranks 619 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
619 Nadara this page 1
101 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Nadara

15 people at Nadara

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 4 managers and 4 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

15 contacts

C-Suite 1
VP 3
Director 4
Manager 4
Senior 3
View as table
SeniorityContacts
C-Suite1
VP3
Director4
Manager4
Senior3
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 15 contacts
PersonTitleDepartmentSeniorityContact
15 contacts at Nadara for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Nadara project

The one project with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: NadaraSort: MW, largest first 1 project
ProjectCountyGridMWQueue dateIn serviceAgreement
1 project and 101 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 15 contacts.

Request access

Get alerts for Nadara

We email you when Nadara adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Nadara project and the 15 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.