FieldProspects

MN8 Energy

Power developer19 projects on record Data as of

MN8 Energy has 8 planned power projects totaling 320 MW and 11 operating projects totaling 323.9 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 173 contacts at the company are on file.

320MW
planned, 8 projects
323.9MW
operating, 11 projects
320MW
interconnection agreement signed, 100% of planned
140MW
under construction, 3 projects
0MW
past due, 0 projects
173
contacts on file
Map

Where MN8 Energy's planned pipeline sits

Planned MW by state. Everything sits in Pennsylvania.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Pennsylvania320 MW8 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
1MW planned

for every MW MN8 Energy operates today.

PlannedOperating
Solar 320 MW
323.9 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar8320 MW11323.9 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed320 MW, 100%
8 of 8 planned projects (100%)
Under construction140 MW, 44%
3 of 8 planned projects (38%)
Past due0 MW, 0%
0 of 8 planned projects (0%)
0% of MN8 Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of MN8 Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
050100150200 Snapshot year 80 MW 2026 2027 180 MW 2028
View as table
YearProjectsMW
2026180 MW
2027260 MW
20285180 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

MN8 Energy's planned MW sits entirely in PJM Interconnection.

Figure 2

Planned MW by grid operator

8 planned projects

PJM Interconnection 320 MW 8 projects
View as table
GridPlanned projectsPlanned MW
PJM Interconnection8320 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2020 was the biggest year.

0100200300 240 MW 2020
View as table
Queue yearProjectsMW
20207240 MW
Source. 1 project without a queue date is left out MW

Changes since the June 4, 2026 snapshot

What moved in MN8 Energy's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+1
project added, 80 MW
0
came online
0
cancelled, inactive or dropped
0
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: MN8 EnergyChange: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when MN8 Energy's pipeline moves.

Request access

MN8 Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. MN8 Energy ranks 365 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
365 MN8 Energy this page 8
320 MW
11
323.9 MW
1.01

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus MN8 Energy

173 people at MN8 Energy

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 82 managers and 37 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

173 contacts

C-Suite 6
Owner 1
Partner 2
Head 7
VP 14
Director 37
Manager 82
Senior 23
Unknown 1
View as table
SeniorityContacts
C-Suite6
Owner1
Partner2
Head7
VP14
Director37
Manager82
Senior23
Unknown1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 173 contacts
PersonTitleDepartmentSeniorityContact
173 contacts at MN8 Energy for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every MN8 Energy project

All 19 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: MN8 EnergySort: MW, largest first 19 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
19 projects and 643.9 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 173 contacts.

Request access

Get alerts for MN8 Energy

We email you when MN8 Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every MN8 Energy project and the 173 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.