MN8 Energy
MN8 Energy has 8 planned power projects totaling 320 MW and 11 operating projects totaling 323.9 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 173 contacts at the company are on file.
Where MN8 Energy's planned pipeline sits
Planned MW by state. Everything sits in Pennsylvania.
Largest states
- Pennsylvania320 MW8 projects, 100% of planned
for every MW MN8 Energy operates today.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 8 | 320 MW | 11 | 323.9 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of MN8 Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 1 | 80 MW |
| 2027 | 2 | 60 MW |
| 2028 | 5 | 180 MW |
Pipeline by grid and queue year
MN8 Energy's planned MW sits entirely in PJM Interconnection.
Planned MW by grid operator
8 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| PJM Interconnection | 8 | 320 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2020 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2020 | 7 | 240 MW |
Changes since the June 4, 2026 snapshot
What moved in MN8 Energy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when MN8 Energy's pipeline moves.
MN8 Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. MN8 Energy ranks 365 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 365 | MN8 Energy this page | 8 | 11 | 1.01 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus MN8 Energy173 people at MN8 Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 82 managers and 37 directors are where interconnection and procurement decisions start.
By seniority
173 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 6 |
| Owner | 1 |
| Partner | 2 |
| Head | 7 |
| VP | 14 |
| Director | 37 |
| Manager | 82 |
| Senior | 23 |
| Unknown | 1 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every MN8 Energy project
All 19 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 173 contacts.
Get alerts for MN8 Energy
We email you when MN8 Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every MN8 Energy project and the 173 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.