Middle River Power
Middle River Power has 4 planned power projects totaling 451.8 MW and 2 operating projects totaling 114.6 MW in the FieldProspects database. 88% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 37 contacts at the company are on file.
Where Middle River Power's planned pipeline sits
Planned MW by state. Everything sits in California.
Largest states
- California451.8 MW4 projects, 100% of planned
for every MW Middle River Power operates today. Battery Storage is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Battery Storage | 4 | 451.8 MW | 1 | 54.1 MW |
| Natural Gas | 0 | 0 MW | 1 | 60.5 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Middle River Power's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 0 | 0 MW |
| 2027 | 3 | 238.2 MW |
| 2028 | 0 | 0 MW |
| 2029 | 0 | 0 MW |
| 2030 | 0 | 0 MW |
| 2031 | 1 | 213.6 MW |
Pipeline by grid and queue year
Middle River Power's planned MW sits entirely in California ISO (CAISO).
Planned MW by grid operator
4 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| California ISO (CAISO) | 4 | 451.8 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2021 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2021 | 1 | 213.6 MW |
Changes since the June 4, 2026 snapshot
What moved in Middle River Power's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Middle River Power's pipeline moves.
Middle River Power against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Middle River Power ranks 296 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 296 | Middle River Power this page | 4 | 2 | 0.25 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Middle River Power37 people at Middle River Power
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 12 managers and 11 directors are where interconnection and procurement decisions start.
By seniority
37 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 2 |
| VP | 9 |
| Director | 11 |
| Manager | 12 |
| Senior | 3 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Middle River Power project
All 6 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 37 contacts.
Get alerts for Middle River Power
We email you when Middle River Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Middle River Power project and the 37 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.