MidAmerican Energy

Power developer5 projects on record Data as of

MidAmerican Energy has 4 planned power projects totaling 500 MW and 1 operating project totaling 214.3 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 80% is past its listed in-service date. The projects sit in 1 state and 2 technologies.

500MW
planned, 4 projects
214.3MW
operating, 1 project
500MW
interconnection agreement signed, 100% of planned
50MW
under construction, 1 project
400MW
past due, 2 projects
1
state
Map

Where MidAmerican Energy's planned pipeline sits

Planned MW by state. Everything sits in Iowa.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Iowa500 MW4 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
2.3MW planned

for every MW MidAmerican Energy operates today. Wind is most of the gap.

PlannedOperating
Wind 400 MW
214.3 MW
Solar 100 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Wind2400 MW1214.3 MW
Solar2100 MW00 MW

MW by technologySolar has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed500 MW, 100%
4 of 4 planned projects (100%)
Under construction50 MW, 10%
1 of 4 planned projects (25%)
Past due400 MW, 80%
2 of 4 planned projects (50%)
80% of MidAmerican Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of MidAmerican Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
050100150200 Snapshot year 200 MW 2021 200 MW 2022 2023 2024 2025 100 MW 2026
View as table
YearProjectsMW
20211200 MW
20221200 MW
202300 MW
202400 MW
202500 MW
20262100 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

MidAmerican Energy's planned MW sits entirely in Midcontinent ISO (MISO).

Figure 2

Planned MW by grid operator

4 planned projects

Midcontinent ISO (MISO) 500 MW 4 projects
View as table
GridPlanned projectsPlanned MW
Midcontinent ISO (MISO)4500 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2016 was the biggest year.

050100150200 200 MW 2016 2017 200 MW 2018 2019 2020 2021
View as table
Queue yearProjectsMW
20161200 MW
201700 MW
20181200 MW
201900 MW
202000 MW
2021150 MW
Source. 1 project without a queue date is left out MW

Changes since the June 4, 2026 snapshot

What moved in MidAmerican Energy's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+1
project added, 50 MW
0
came online
0
cancelled, inactive or dropped
0
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: MidAmerican EnergyChange: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when MidAmerican Energy's pipeline moves.

Request access

MidAmerican Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. MidAmerican Energy ranks 279 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
279 MidAmerican Energy this page 4
500 MW
1
214.3 MW
0.43

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus MidAmerican Energy

Every MidAmerican Energy project

All 5 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: MidAmerican EnergySort: MW, largest first 5 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
5 projects and 714.3 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for MidAmerican Energy

We email you when MidAmerican Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every MidAmerican Energy project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.