MGE has 2 planned power projects totaling 60 MW and 5 operating projects totaling 33 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 217 contacts at the company are on file.
Where MGE's planned pipeline sits
Planned MW by state. Everything sits in Wisconsin.
Largest states
- Wisconsin60 MW2 projects, 100% of planned
for every MW MGE operates today. Battery Storage is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Battery Storage | 1 | 40 MW | 3 | 21 MW |
| Solar | 1 | 20 MW | 2 | 12 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of MGE's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 2 | 60 MW |
Pipeline by grid and queue year
MGE's planned MW sits entirely in Midcontinent ISO (MISO).
Planned MW by grid operator
2 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| Midcontinent ISO (MISO) | 2 | 60 MW |
MGE against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. MGE ranks 673 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 673 | MGE this page | 2 | 5 | 0.55 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus MGE217 people at MGE
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 120 managers and 36 directors are where interconnection and procurement decisions start.
By seniority
217 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 2 |
| Partner | 2 |
| VP | 8 |
| Director | 36 |
| Manager | 120 |
| Senior | 49 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every MGE project
All 7 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 217 contacts.
Get alerts for MGE
We email you when MGE adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every MGE project and the 217 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.