Power developer7 projects on record Data as of

MGE has 2 planned power projects totaling 60 MW and 5 operating projects totaling 33 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 217 contacts at the company are on file.

60MW
planned, 2 projects
33MW
operating, 5 projects
60MW
interconnection agreement signed, 100% of planned
60MW
under construction, 2 projects
0MW
past due, 0 projects
217
contacts on file
Map

Where MGE's planned pipeline sits

Planned MW by state. Everything sits in Wisconsin.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Wisconsin60 MW2 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
1.8MW planned

for every MW MGE operates today. Battery Storage is most of the gap.

PlannedOperating
Battery Storage 40 MW
21 MW
Solar 20 MW
12 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage140 MW321 MW
Solar120 MW212 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed60 MW, 100%
2 of 2 planned projects (100%)
Under construction60 MW, 100%
2 of 2 planned projects (100%)
Past due0 MW, 0%
0 of 2 planned projects (0%)
0% of MGE's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of MGE's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0204060 Snapshot year 60 MW 2026
View as table
YearProjectsMW
2026260 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

MGE's planned MW sits entirely in Midcontinent ISO (MISO).

Figure 2

Planned MW by grid operator

2 planned projects

Midcontinent ISO (MISO) 60 MW 2 projects
View as table
GridPlanned projectsPlanned MW
Midcontinent ISO (MISO)260 MW

MGE against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. MGE ranks 673 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
673 MGE this page 2
60 MW
5
33 MW
0.55

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus MGE

217 people at MGE

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 120 managers and 36 directors are where interconnection and procurement decisions start.

Figure 3

By seniority

217 contacts

C-Suite 2
Partner 2
VP 8
Director 36
Manager 120
Senior 49
View as table
SeniorityContacts
C-Suite2
Partner2
VP8
Director36
Manager120
Senior49
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 217 contacts
PersonTitleDepartmentSeniorityContact
217 contacts at MGE for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every MGE project

All 7 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: MGESort: MW, largest first 7 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
7 projects and 93 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 217 contacts.

Request access

Get alerts for MGE

We email you when MGE adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every MGE project and the 217 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.