FieldProspects

MCV 1 LLC

Power developer1 project on record Data as of

MCV 1 LLC has 1 planned power project totaling 378 MW in the FieldProspects database and no operating project on record. 0% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 1 state and 1 technology.

378MW
planned, 1 project
0MW
operating, 0 projects
0MW
interconnection agreement signed, 0% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
1
state
Map

Where MCV 1 LLC's planned pipeline sits

Planned MW by state. Everything sits in Texas.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas378 MW1 project, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
378 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Natural Gas 378 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Natural Gas1378 MW00 MW

MW by technologyNatural Gas has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed0 MW, 0%
0 of 1 planned project (0%)
Under construction0 MW, 0%
0 of 1 planned project (0%)
Past due0 MW, 0%
0 of 1 planned project (0%)
0% of MCV 1 LLC's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of MCV 1 LLC's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0100200300400 Snapshot year 2026 378 MW 2027
View as table
YearProjectsMW
202600 MW
20271378 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

MCV 1 LLC's planned MW sits entirely in ERCOT.

Figure 2

Planned MW by grid operator

1 planned project

ERCOT 378 MW 1 project
View as table
GridPlanned projectsPlanned MW
ERCOT1378 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2026 was the biggest year.

0100200300400 378 MW 2026
View as table
Queue yearProjectsMW
20261378 MW
Source. Every planned project has a queue date MW

Changes since the June 4, 2026 snapshot

What moved in MCV 1 LLC's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+1
project added, 378 MW
0
came online
0
cancelled, inactive or dropped
0
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: MCV 1 LLCChange: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when MCV 1 LLC's pipeline moves.

Request access

MCV 1 LLC against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. MCV 1 LLC ranks 347 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
347 MCV 1 LLC this page 1
378 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus MCV 1 LLC

Every MCV 1 LLC project

The one project with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: MCV 1 LLCSort: MW, largest first 1 project
ProjectCountyGridMWQueue dateIn serviceAgreement
1 project and 378 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for MCV 1 LLC

We email you when MCV 1 LLC adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every MCV 1 LLC project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.