FieldProspects

Matrix Renewables

Power developer9 projects on record Data as of

Matrix Renewables has 7 planned power projects totaling 1.7 GW and 2 operating projects totaling 410 MW in the FieldProspects database. 51% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 25 contacts at the company are on file.

1.7GW
planned, 7 projects
410MW
operating, 2 projects
858.2MW
interconnection agreement signed, 51% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
25
contacts on file
Map

Where Matrix Renewables' planned pipeline sits

Planned MW by state. Everything sits in Texas.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas1.7 GW7 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
4.1MW planned

for every MW Matrix Renewables operates today. Battery Storage is most of the gap.

PlannedOperating
Battery Storage 1 GW
none
Solar 667.1 MW
410 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage41 GW00 MW
Solar3667.1 MW2410 MW

MW by technologyBattery Storage has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed858.2 MW, 51%
4 of 7 planned projects (57%)
Under construction0 MW, 0%
0 of 7 planned projects (0%)
Past due0 MW, 0%
0 of 7 planned projects (0%)
0% of Matrix Renewables' planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Matrix Renewables' planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0200400600 Snapshot year 2026 2027 485 MW 2028 2029 2030 2031 2032
View as table
YearProjectsMW
202600 MW
20271356.6 MW
20282485 MW
20292452.4 MW
203000 MW
203100 MW
20322375.7 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Matrix Renewables' planned MW sits entirely in ERCOT.

Figure 2

Planned MW by grid operator

7 planned projects

ERCOT 1.7 GW 7 projects
View as table
GridPlanned projectsPlanned MW
ERCOT71.7 GW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2025 was the biggest year.

02505007501k 2020 2021 2022 2023 2024 811.5 MW 2025
View as table
Queue yearProjectsMW
20201356.6 MW
202100 MW
202200 MW
20231125.9 MW
20242375.7 MW
20253811.5 MW
Source. Every planned project has a queue date MW

Changes since the June 4, 2026 snapshot

What moved in Matrix Renewables' queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
1
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Matrix RenewablesChange: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when Matrix Renewables' pipeline moves.

Request access

Matrix Renewables against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Matrix Renewables ranks 98 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
98 Matrix Renewables this page 7
1.7 GW
2
410 MW
0.25

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Matrix Renewables

25 people at Matrix Renewables

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 8 managers and 5 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

25 contacts

C-Suite 1
Head 4
VP 2
Director 5
Manager 8
Senior 4
Unknown 1
View as table
SeniorityContacts
C-Suite1
Head4
VP2
Director5
Manager8
Senior4
Unknown1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 25 contacts
PersonTitleDepartmentSeniorityContact
25 contacts at Matrix Renewables for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Matrix Renewables project

All 9 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Matrix RenewablesSort: MW, largest first 9 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
9 projects and 2.1 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 25 contacts.

Request access

Get alerts for Matrix Renewables

We email you when Matrix Renewables adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Matrix Renewables project and the 25 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.