Marathon Power

Power developer1 project on record Data as of

Marathon Power has 1 planned power project totaling 135 MW in the FieldProspects database and no operating project on record. 0% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 1 state and 1 technology.

135MW
planned, 1 project
0MW
operating, 0 projects
0MW
interconnection agreement signed, 0% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
1
state
Map

Where Marathon Power's planned pipeline sits

Planned MW by state. Everything sits in New York.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. New York135 MW1 project, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
135 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Battery Storage 135 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage1135 MW00 MW

MW by technologyBattery Storage has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed0 MW, 0%
0 of 1 planned project (0%)
Under construction0 MW, 0%
0 of 1 planned project (0%)
Past due0 MW, 0%
0 of 1 planned project (0%)
0% of Marathon Power's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Marathon Power's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
050100150 Snapshot year 2026 2027 135 MW 2028
View as table
YearProjectsMW
202600 MW
202700 MW
20281135 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Marathon Power's planned MW sits entirely in New York ISO (NYISO).

Figure 2

Planned MW by grid operator

1 planned project

New York ISO (NYISO) 135 MW 1 project
View as table
GridPlanned projectsPlanned MW
New York ISO (NYISO)1135 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2024 was the biggest year.

050100150 135 MW 2024
View as table
Queue yearProjectsMW
20241135 MW
Source. Every planned project has a queue date MW

Marathon Power against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Marathon Power ranks 583 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
583 Marathon Power this page 1
135 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Marathon Power

Every Marathon Power project

The one project with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Marathon PowerSort: MW, largest first 1 project
ProjectCountyGridMWQueue dateIn serviceAgreement
1 project and 135 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Marathon Power

We email you when Marathon Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Marathon Power project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.