Lydian Energy
Lydian Energy has 9 planned power projects totaling 1.4 GW and 1 operating project totaling 150 MW in the FieldProspects database. 67% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 7 contacts at the company are on file.
Where Lydian Energy's planned pipeline sits
Planned MW by state. The 3 largest states hold 1.4 GW of the 1.4 GW.
Largest states
- Texas811.1 MW4 projects, 56% of planned
- New Mexico380 MW3 projects, 26% of planned
- New York250 MW2 projects, 17% of planned
for every MW Lydian Energy operates today. Battery Storage is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Battery Storage | 4 | 811.1 MW | 1 | 150 MW |
| Solar | 5 | 630 MW | 0 | 0 MW |
MW by technologySolar has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Lydian Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 4 | 811.1 MW |
| 2027 | 2 | 150 MW |
| 2028 | 2 | 250 MW |
| 2029 | 1 | 230 MW |
Pipeline by grid and queue year
Lydian Energy's planned MW leans on ERCOT, Southwest Power Pool (SPP) and New York ISO (NYISO). ERCOT alone holds 56% of it.
Planned MW by grid operator
9 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 4 | 811.1 MW |
| Southwest Power Pool (SPP) | 3 | 380 MW |
| New York ISO (NYISO) | 2 | 250 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2022 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2018 | 1 | 75 MW |
| 2019 | 0 | 0 MW |
| 2020 | 0 | 0 MW |
| 2021 | 0 | 0 MW |
| 2022 | 2 | 411.1 MW |
Changes since the June 4, 2026 snapshot
What moved in Lydian Energy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Lydian Energy's pipeline moves.
Lydian Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Lydian Energy ranks 108 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 108 | Lydian Energy this page | 9 | 1 | 0.10 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Lydian Energy7 people at Lydian Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named.
By seniority
7 contacts
View as table
| Seniority | Contacts |
|---|---|
| Founder | 1 |
| Head | 2 |
| Senior | 4 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Lydian Energy project
All 10 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 7 contacts.
Get alerts for Lydian Energy
We email you when Lydian Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Lydian Energy project and the 7 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.