Luminant Energy
Luminant Energy has 2 planned power projects totaling 220 MW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 448 contacts at the company are on file.
Where Luminant Energy's planned pipeline sits
Planned MW by state. The 2 largest states hold 220 MW of the 220 MW.
and no operating project on record yet. Everything here is pipeline.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 1 | 200 MW | 0 | 0 MW |
| Battery Storage | 1 | 20 MW | 0 | 0 MW |
MW by technologySolar and Battery Storage have no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Luminant Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 1 | 200 MW |
| 2027 | 0 | 0 MW |
| 2028 | 1 | 20 MW |
Pipeline by grid and queue year
Luminant Energy's planned MW leans on ERCOT and PJM Interconnection. ERCOT alone holds 91% of it.
Planned MW by grid operator
2 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 1 | 200 MW |
| PJM Interconnection | 1 | 20 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2017 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2017 | 1 | 200 MW |
| 2018 | 0 | 0 MW |
| 2019 | 1 | 20 MW |
Luminant Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Luminant Energy ranks 454 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 454 | Luminant Energy this page | 2 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Luminant Energy448 people at Luminant Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 305 managers and 29 directors are where interconnection and procurement decisions start.
By seniority
448 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 1 |
| VP | 1 |
| Director | 29 |
| Manager | 305 |
| Senior | 110 |
| Entry | 1 |
| Unknown | 1 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Luminant Energy project
All 2 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 448 contacts.
Get alerts for Luminant Energy
We email you when Luminant Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Luminant Energy project and the 448 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.