Luminant Energy

Power developer2 projects on record Data as of

Luminant Energy has 2 planned power projects totaling 220 MW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 448 contacts at the company are on file.

220MW
planned, 2 projects
0MW
operating, 0 projects
220MW
interconnection agreement signed, 100% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
448
contacts on file
Map

Where Luminant Energy's planned pipeline sits

Planned MW by state. The 2 largest states hold 220 MW of the 220 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas200 MW1 project, 91% of planned
  2. Illinois20 MW1 project, 9% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
220 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Solar 200 MW
none
Battery Storage 20 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar1200 MW00 MW
Battery Storage120 MW00 MW

MW by technologySolar and Battery Storage have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed220 MW, 100%
2 of 2 planned projects (100%)
Under construction0 MW, 0%
0 of 2 planned projects (0%)
Past due0 MW, 0%
0 of 2 planned projects (0%)
0% of Luminant Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Luminant Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
050100150200 Snapshot year 200 MW 2026 2027 2028
View as table
YearProjectsMW
20261200 MW
202700 MW
2028120 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Luminant Energy's planned MW leans on ERCOT and PJM Interconnection. ERCOT alone holds 91% of it.

Figure 2

Planned MW by grid operator

2 planned projects

ERCOT 200 MW 1 project
PJM Interconnection 20 MW 1 project
View as table
GridPlanned projectsPlanned MW
ERCOT1200 MW
PJM Interconnection120 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2017 was the biggest year.

050100150200 200 MW 2017 2018 2019
View as table
Queue yearProjectsMW
20171200 MW
201800 MW
2019120 MW
Source. Every planned project has a queue date MW

Luminant Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Luminant Energy ranks 454 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
454 Luminant Energy this page 2
220 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Luminant Energy

448 people at Luminant Energy

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 305 managers and 29 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

448 contacts

C-Suite 1
VP 1
Director 29
Manager 305
Senior 110
Entry 1
Unknown 1
View as table
SeniorityContacts
C-Suite1
VP1
Director29
Manager305
Senior110
Entry1
Unknown1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 448 contacts
PersonTitleDepartmentSeniorityContact
448 contacts at Luminant Energy for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Luminant Energy project

All 2 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Luminant EnergySort: MW, largest first 2 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
2 projects and 220 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 448 contacts.

Request access

Get alerts for Luminant Energy

We email you when Luminant Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Luminant Energy project and the 448 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.