FieldProspects

LS Power

Power developer1 project on record Data as of

LS Power has 1 planned power project totaling 200 MW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. It also has 1 data center record.

200MW
planned, 1 project
0MW
operating, 0 projects
200MW
interconnection agreement signed, 100% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
1
data center
Map

Where LS Power's planned pipeline sits

Planned MW by state. Everything sits in Texas.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas200 MW1 project, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
200 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Battery Storage 200 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage1200 MW00 MW

MW by technologyBattery Storage has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed200 MW, 100%
1 of 1 planned project (100%)
Under construction0 MW, 0%
0 of 1 planned project (0%)
Past due0 MW, 0%
0 of 1 planned project (0%)
0% of LS Power's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of LS Power's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
050100150200 Snapshot year 2026 2027 2028 2029 2030 200 MW 2031
View as table
YearProjectsMW
202600 MW
202700 MW
202800 MW
202900 MW
203000 MW
20311200 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

LS Power's planned MW sits entirely in Southwest Power Pool (SPP).

Figure 2

Planned MW by grid operator

1 planned project

Southwest Power Pool (SPP) 200 MW 1 project
View as table
GridPlanned projectsPlanned MW
Southwest Power Pool (SPP)1200 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2020 was the biggest year.

050100150200 200 MW 2020
View as table
Queue yearProjectsMW
20201200 MW
Source. Every planned project has a queue date MW

LS Power against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. LS Power ranks 521 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
521 LS Power this page 1
200 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus LS Power

Every LS Power project

The one project with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: LS PowerSort: MW, largest first 1 project
ProjectCountyGridMWQueue dateIn serviceAgreement
1 project and 200 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for LS Power

We email you when LS Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every LS Power project, with its county, dates and queue status.