Lotus Infrastructure Partners
Lotus Infrastructure Partners has 4 planned power projects totaling 597.2 MW and 1 operating project totaling 140.3 MW in the FieldProspects database. 95% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 7 contacts at the company are on file.
Where Lotus Infrastructure Partners' planned pipeline sits
Planned MW by state. The 2 largest states hold 597.2 MW of the 597.2 MW.
for every MW Lotus Infrastructure Partners operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 1 | 426 MW | 0 | 0 MW |
| Wind | 3 | 171.2 MW | 1 | 140.3 MW |
MW by technologySolar has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Lotus Infrastructure Partners' planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 1 | 140.3 MW |
| 2027 | 2 | 30.9 MW |
| 2028 | 1 | 426 MW |
Pipeline by grid and queue year
Lotus Infrastructure Partners' planned MW leans on ERCOT and PJM Interconnection. ERCOT alone holds 77% of it.
Planned MW by grid operator
4 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 3 | 456.9 MW |
| PJM Interconnection | 1 | 140.3 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2021 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2018 | 1 | 140.3 MW |
| 2019 | 0 | 0 MW |
| 2020 | 0 | 0 MW |
| 2021 | 1 | 426 MW |
| 2022 | 0 | 0 MW |
| 2023 | 1 | 12.4 MW |
| 2024 | 1 | 18.5 MW |
Changes since the June 4, 2026 snapshot
What moved in Lotus Infrastructure Partners' queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Lotus Infrastructure Partners' pipeline moves.
Lotus Infrastructure Partners against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Lotus Infrastructure Partners ranks 256 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 256 | Lotus Infrastructure Partners this page | 4 | 1 | 0.23 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Lotus Infrastructure Partners7 people at Lotus Infrastructure Partners
Contacts with title, seniority, department, email and LinkedIn, counted here and never named.
By seniority
7 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 1 |
| Head | 2 |
| VP | 4 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Lotus Infrastructure Partners project
All 5 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 7 contacts.
Get alerts for Lotus Infrastructure Partners
We email you when Lotus Infrastructure Partners adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Lotus Infrastructure Partners project and the 7 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.