Longroad Energy
Longroad Energy has 17 planned power projects totaling 2.6 GW and 8 operating projects totaling 1.5 GW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 6% is past its listed in-service date. 117 contacts at the company are on file.
Where Longroad Energy's planned pipeline sits
Planned MW by state. The 3 largest states hold 2.6 GW of the 2.6 GW.
Largest states
- California1.1 GW9 projects, 44% of planned
- Texas1.1 GW4 projects, 41% of planned
- Arkansas400 MW4 projects, 16% of planned
for every MW Longroad Energy operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 9 | 1.5 GW | 5 | 865 MW |
| Battery Storage | 8 | 1.1 GW | 3 | 598.8 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Longroad Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2023 | 1 | 150 MW |
| 2024 | 0 | 0 MW |
| 2025 | 0 | 0 MW |
| 2026 | 6 | 1 GW |
| 2027 | 4 | 305 MW |
| 2028 | 3 | 372.3 MW |
| 2029 | 0 | 0 MW |
| 2030 | 2 | 224.9 MW |
| 2031 | 1 | 515.4 MW |
Pipeline by grid and queue year
Longroad Energy's planned MW leans on California ISO (CAISO), Southwest Power Pool (SPP) and Midcontinent ISO (MISO). California ISO (CAISO) alone holds 44% of it.
Planned MW by grid operator
17 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| California ISO (CAISO) | 9 | 1.1 GW |
| Southwest Power Pool (SPP) | 3 | 900 MW |
| Midcontinent ISO (MISO) | 5 | 550 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2021 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2017 | 1 | 300 MW |
| 2018 | 1 | 150 MW |
| 2019 | 0 | 0 MW |
| 2020 | 8 | 627.3 MW |
| 2021 | 3 | 740.3 MW |
| 2022 | 0 | 0 MW |
| 2023 | 0 | 0 MW |
| 2024 | 1 | 300 MW |
Changes since the June 4, 2026 snapshot
What moved in Longroad Energy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Longroad Energy's pipeline moves.
Longroad Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Longroad Energy ranks 61 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 61 | Longroad Energy this page | 17 | 8 | 0.57 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Longroad Energy117 people at Longroad Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 48 managers and 20 directors are where interconnection and procurement decisions start.
By seniority
117 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 1 |
| Founder | 4 |
| Owner | 1 |
| Partner | 1 |
| VP | 17 |
| Director | 20 |
| Manager | 48 |
| Senior | 24 |
| Entry | 1 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Longroad Energy project
All 25 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 117 contacts.
Get alerts for Longroad Energy
We email you when Longroad Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Longroad Energy project and the 117 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.