Linea Energy
Linea Energy has 7 planned power projects totaling 1.9 GW and 1 operating project totaling 80 MW in the FieldProspects database. 77% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 25 contacts at the company are on file.
Where Linea Energy's planned pipeline sits
Planned MW by state. The 3 largest states hold 1.9 GW of the 1.9 GW.
Largest states
- Texas1.7 GW5 projects, 86% of planned
- Michigan154 MW1 project, 8% of planned
- Pennsylvania110 MW1 project, 6% of planned
for every MW Linea Energy operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 4 | 1.2 GW | 1 | 80 MW |
| Battery Storage | 3 | 731.8 MW | 0 | 0 MW |
MW by technologyBattery Storage has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Linea Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 2 | 477 MW |
| 2027 | 5 | 1.5 GW |
Pipeline by grid and queue year
Linea Energy's planned MW leans on ERCOT, Midcontinent ISO (MISO) and PJM Interconnection. ERCOT alone holds 86% of it.
Planned MW by grid operator
7 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 5 | 1.7 GW |
| Midcontinent ISO (MISO) | 1 | 154 MW |
| PJM Interconnection | 1 | 110 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2020 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2019 | 1 | 110 MW |
| 2020 | 1 | 502.5 MW |
| 2021 | 0 | 0 MW |
| 2022 | 0 | 0 MW |
| 2023 | 2 | 495.9 MW |
| 2024 | 1 | 451.4 MW |
Changes since the June 4, 2026 snapshot
What moved in Linea Energy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Linea Energy's pipeline moves.
Linea Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Linea Energy ranks 86 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 86 | Linea Energy this page | 7 | 1 | 0.04 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Linea Energy25 people at Linea Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 3 managers and 8 directors are where interconnection and procurement decisions start.
By seniority
25 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 3 |
| Head | 1 |
| VP | 4 |
| Director | 8 |
| Manager | 3 |
| Senior | 5 |
| Unknown | 1 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Linea Energy project
All 8 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 25 contacts.
Get alerts for Linea Energy
We email you when Linea Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Linea Energy project and the 25 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.