Linea Energy

Power developer8 projects on record Data as of

Linea Energy has 7 planned power projects totaling 1.9 GW and 1 operating project totaling 80 MW in the FieldProspects database. 77% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 25 contacts at the company are on file.

1.9GW
planned, 7 projects
80MW
operating, 1 project
1.5GW
interconnection agreement signed, 77% of planned
389.9MW
under construction, 2 projects
0MW
past due, 0 projects
25
contacts on file
Map

Where Linea Energy's planned pipeline sits

Planned MW by state. The 3 largest states hold 1.9 GW of the 1.9 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas1.7 GW5 projects, 86% of planned
  2. Michigan154 MW1 project, 8% of planned
  3. Pennsylvania110 MW1 project, 6% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
24.4MW planned

for every MW Linea Energy operates today. Solar is most of the gap.

PlannedOperating
Solar 1.2 GW
80 MW
Battery Storage 731.8 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar41.2 GW180 MW
Battery Storage3731.8 MW00 MW

MW by technologyBattery Storage has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed1.5 GW, 77%
6 of 7 planned projects (86%)
Under construction389.9 MW, 20%
2 of 7 planned projects (29%)
Past due0 MW, 0%
0 of 7 planned projects (0%)
0% of Linea Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Linea Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
05001k1.5k Snapshot year 477 MW 2026 1.5 GW 2027
View as table
YearProjectsMW
20262477 MW
202751.5 GW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Linea Energy's planned MW leans on ERCOT, Midcontinent ISO (MISO) and PJM Interconnection. ERCOT alone holds 86% of it.

Figure 2

Planned MW by grid operator

7 planned projects

ERCOT 1.7 GW 5 projects
Midcontinent ISO (MISO) 154 MW 1 project
PJM Interconnection 110 MW 1 project
View as table
GridPlanned projectsPlanned MW
ERCOT51.7 GW
Midcontinent ISO (MISO)1154 MW
PJM Interconnection1110 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2020 was the biggest year.

0200400600 2019 502.5 MW 2020 2021 2022 2023 2024
View as table
Queue yearProjectsMW
20191110 MW
20201502.5 MW
202100 MW
202200 MW
20232495.9 MW
20241451.4 MW
Source. 2 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Linea Energy's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+1
project added, 154 MW
1
came online
0
cancelled, inactive or dropped
2
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Linea EnergyChange: any 4 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
4 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Linea Energy's pipeline moves.

Request access

Linea Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Linea Energy ranks 86 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
86 Linea Energy this page 7
1.9 GW
1
80 MW
0.04

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Linea Energy

25 people at Linea Energy

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 3 managers and 8 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

25 contacts

C-Suite 3
Head 1
VP 4
Director 8
Manager 3
Senior 5
Unknown 1
View as table
SeniorityContacts
C-Suite3
Head1
VP4
Director8
Manager3
Senior5
Unknown1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 25 contacts
PersonTitleDepartmentSeniorityContact
25 contacts at Linea Energy for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Linea Energy project

All 8 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Linea EnergySort: MW, largest first 8 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
8 projects and 2 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 25 contacts.

Request access

Get alerts for Linea Energy

We email you when Linea Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Linea Energy project and the 25 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.