FieldProspects

Lightsource bp

Power developer52 projects on record Data as of

Lightsource bp has 38 planned power projects totaling 5.3 GW and 14 operating projects totaling 1.3 GW in the FieldProspects database. 66% of the planned capacity has an interconnection agreement and 28% is past its listed in-service date. 154 contacts at the company are on file.

5.3GW
planned, 38 projects
1.3GW
operating, 14 projects
3.5GW
interconnection agreement signed, 66% of planned
797MW
under construction, 6 projects
1.5GW
past due, 12 projects
154
contacts on file
Map

Where Lightsource bp's planned pipeline sits

Planned MW by state. The 6 largest states hold 5.2 GW of the 5.3 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas2.7 GW17 projects, 51% of planned
  2. Indiana784 MW5 projects, 15% of planned
  3. Louisiana745.1 MW5 projects, 14% of planned
  4. Arkansas425 MW4 projects, 8% of planned
  5. Nebraska320 MW3 projects, 6% of planned
  6. Ohio232 MW3 projects, 4% of planned

1 more state with less.

Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
3.9MW planned

for every MW Lightsource bp operates today. Solar is most of the gap.

PlannedOperating
Solar 4.4 GW
1.3 GW
Battery Storage 761.6 MW
none
Solar + Storage (Hybrid) 120 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar304.4 GW141.3 GW
Battery Storage7761.6 MW00 MW
Solar + Storage (Hybrid)1120 MW00 MW

MW by technologyBattery Storage and Solar + Storage (Hybrid) have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed3.5 GW, 66%
25 of 38 planned projects (66%)
Under construction797 MW, 15%
6 of 38 planned projects (16%)
Past due1.5 GW, 28%
12 of 38 planned projects (32%)
28% of Lightsource bp's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Lightsource bp's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
05001k1.5k Snapshot year 2022 2023 2024 2025 1 GW 2026 2027 2028 2029 2030 2031
View as table
YearProjectsMW
20221150 MW
20234495 MW
20241145.1 MW
20256692.1 MW
202661 GW
20276710 MW
20287842.5 MW
20294947 MW
20301100 MW
20312210 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Lightsource bp's planned MW leans on ERCOT, Midcontinent ISO (MISO) and PJM Interconnection. ERCOT alone holds 51% of it.

Figure 2

Planned MW by grid operator

38 planned projects

ERCOT 2.7 GW 17 projects
Midcontinent ISO (MISO) 1.4 GW 11 projects
PJM Interconnection 716 MW 5 projects
Southwest Power Pool (SPP) 480 MW 5 projects
View as table
GridPlanned projectsPlanned MW
ERCOT172.7 GW
Midcontinent ISO (MISO)111.4 GW
PJM Interconnection5716 MW
Southwest Power Pool (SPP)5480 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2020 was the biggest year.

05001k1.5k 2018 2019 1 GW 2020 2021 2022 2023 2024 2025 2026
View as table
Queue yearProjectsMW
20183366.7 MW
201971 GW
202071 GW
20212255.7 MW
202200 MW
20234270.5 MW
202400 MW
202500 MW
20262603 MW
Source. 13 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Lightsource bp's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+3
projects added, 683 MW
0
came online
0
cancelled, inactive or dropped
6
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Lightsource bpChange: any 10 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
10 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Lightsource bp's pipeline moves.

Request access

Lightsource bp against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Lightsource bp ranks 32 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
32 Lightsource bp this page 38
5.3 GW
14
1.3 GW
0.25

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Lightsource bp

154 people at Lightsource bp

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 82 managers and 33 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

154 contacts

C-Suite 2
Partner 2
Head 6
VP 11
Director 33
Manager 82
Senior 17
Entry 1
View as table
SeniorityContacts
C-Suite2
Partner2
Head6
VP11
Director33
Manager82
Senior17
Entry1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 154 contacts
PersonTitleDepartmentSeniorityContact
154 contacts at Lightsource bp for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Lightsource bp project

All 52 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Lightsource bpSort: MW, largest first 52 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
52 projects and 6.7 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 154 contacts.

Request access

Get alerts for Lightsource bp

We email you when Lightsource bp adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Lightsource bp project and the 154 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.