Lightsource bp
Lightsource bp has 38 planned power projects totaling 5.3 GW and 14 operating projects totaling 1.3 GW in the FieldProspects database. 66% of the planned capacity has an interconnection agreement and 28% is past its listed in-service date. 154 contacts at the company are on file.
Where Lightsource bp's planned pipeline sits
Planned MW by state. The 6 largest states hold 5.2 GW of the 5.3 GW.
for every MW Lightsource bp operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 30 | 4.4 GW | 14 | 1.3 GW |
| Battery Storage | 7 | 761.6 MW | 0 | 0 MW |
| Solar + Storage (Hybrid) | 1 | 120 MW | 0 | 0 MW |
MW by technologyBattery Storage and Solar + Storage (Hybrid) have no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Lightsource bp's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2022 | 1 | 150 MW |
| 2023 | 4 | 495 MW |
| 2024 | 1 | 145.1 MW |
| 2025 | 6 | 692.1 MW |
| 2026 | 6 | 1 GW |
| 2027 | 6 | 710 MW |
| 2028 | 7 | 842.5 MW |
| 2029 | 4 | 947 MW |
| 2030 | 1 | 100 MW |
| 2031 | 2 | 210 MW |
Pipeline by grid and queue year
Lightsource bp's planned MW leans on ERCOT, Midcontinent ISO (MISO) and PJM Interconnection. ERCOT alone holds 51% of it.
Planned MW by grid operator
38 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 17 | 2.7 GW |
| Midcontinent ISO (MISO) | 11 | 1.4 GW |
| PJM Interconnection | 5 | 716 MW |
| Southwest Power Pool (SPP) | 5 | 480 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2020 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2018 | 3 | 366.7 MW |
| 2019 | 7 | 1 GW |
| 2020 | 7 | 1 GW |
| 2021 | 2 | 255.7 MW |
| 2022 | 0 | 0 MW |
| 2023 | 4 | 270.5 MW |
| 2024 | 0 | 0 MW |
| 2025 | 0 | 0 MW |
| 2026 | 2 | 603 MW |
Changes since the June 4, 2026 snapshot
What moved in Lightsource bp's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Lightsource bp's pipeline moves.
Lightsource bp against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Lightsource bp ranks 32 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 32 | Lightsource bp this page | 38 | 14 | 0.25 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Lightsource bp154 people at Lightsource bp
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 82 managers and 33 directors are where interconnection and procurement decisions start.
By seniority
154 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 2 |
| Partner | 2 |
| Head | 6 |
| VP | 11 |
| Director | 33 |
| Manager | 82 |
| Senior | 17 |
| Entry | 1 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Lightsource bp project
All 52 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 154 contacts.
Get alerts for Lightsource bp
We email you when Lightsource bp adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Lightsource bp project and the 154 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.