FieldProspects

Liberty Renewables

Power developer6 projects on record Data as of

Liberty Renewables has 6 planned power projects totaling 496.3 MW in the FieldProspects database and no operating project on record. 34% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 2 contacts at the company are on file.

496.3MW
planned, 6 projects
0MW
operating, 0 projects
169MW
interconnection agreement signed, 34% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
2
contacts on file
Map

Where Liberty Renewables' planned pipeline sits

Planned MW by state. Everything sits in New York.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. New York496.3 MW6 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
496.3 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Wind 496.3 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Wind6496.3 MW00 MW

MW by technologyWind has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed169 MW, 34%
2 of 6 planned projects (33%)
Under construction0 MW, 0%
0 of 6 planned projects (0%)
Past due0 MW, 0%
0 of 6 planned projects (0%)
0% of Liberty Renewables' planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Liberty Renewables' planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0200400600 Snapshot year 2026 2027 2028 496.3 MW 2029
View as table
YearProjectsMW
202600 MW
202700 MW
202800 MW
20296496.3 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Liberty Renewables' planned MW sits entirely in New York ISO (NYISO).

Figure 2

Planned MW by grid operator

6 planned projects

New York ISO (NYISO) 496.3 MW 6 projects
View as table
GridPlanned projectsPlanned MW
New York ISO (NYISO)6496.3 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2021 was the biggest year.

050100150200 169 MW 2021 2022 2023 2024
View as table
Queue yearProjectsMW
20212169 MW
202200 MW
202300 MW
20242124.8 MW
Source. 2 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Liberty Renewables' queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
1
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Liberty RenewablesChange: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when Liberty Renewables' pipeline moves.

Request access

Liberty Renewables against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Liberty Renewables ranks 283 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
283 Liberty Renewables this page 6
496.3 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Liberty Renewables

2 people at Liberty Renewables

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 2 managers are where interconnection and procurement decisions start.

Figure 4

By seniority

2 contacts

Manager 2
View as table
SeniorityContacts
Manager2
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 2 contacts
PersonTitleDepartmentSeniorityContact
2 contacts at Liberty Renewables for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Liberty Renewables project

All 6 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Liberty RenewablesSort: MW, largest first 6 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
6 projects and 496.3 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 2 contacts.

Request access

Get alerts for Liberty Renewables

We email you when Liberty Renewables adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Liberty Renewables project and the 2 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.