Leeward Energy

Power developer68 projects on record Data as of

Leeward Energy has 55 planned power projects totaling 9.3 GW and 13 operating projects totaling 1.4 GW in the FieldProspects database. 70% of the planned capacity has an interconnection agreement and 3% is past its listed in-service date. 180 contacts at the company are on file.

9.3GW
planned, 55 projects
1.4GW
operating, 13 projects
6.5GW
interconnection agreement signed, 70% of planned
1.6GW
under construction, 10 projects
311.6MW
past due, 5 projects
180
contacts on file
Map

Where Leeward Energy's planned pipeline sits

Planned MW by state. The 6 largest states hold 7.8 GW of the 9.3 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Indiana1.9 GW12 projects, 21% of planned
  2. Texas1.6 GW10 projects, 17% of planned
  3. Oklahoma1.5 GW10 projects, 16% of planned
  4. Arizona1.1 GW5 projects, 12% of planned
  5. Nevada1 GW2 projects, 11% of planned
  6. Ohio702.6 MW4 projects, 8% of planned

6 more states with less.

Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
6.4MW planned

for every MW Leeward Energy operates today. Solar is most of the gap.

PlannedOperating
Solar 5.6 GW
1.1 GW
Battery Storage 2.1 GW
327 MW
Wind 1.5 GW
38 MW
Solar + Storage (Hybrid) 200 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar325.6 GW81.1 GW
Battery Storage132.1 GW4327 MW
Wind91.5 GW138 MW
Solar + Storage (Hybrid)1200 MW00 MW

MW by technologySolar + Storage (Hybrid) has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed6.5 GW, 70%
38 of 55 planned projects (69%)
Under construction1.6 GW, 17%
10 of 55 planned projects (18%)
Past due311.6 MW, 3%
5 of 55 planned projects (9%)
3% of Leeward Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Leeward Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
01k2k3k Snapshot year 2023 2024 2025 2 GW 2026 2027 2.7 GW 2028 2029 2030
View as table
YearProjectsMW
20231101.3 MW
2024210.3 MW
20252200 MW
2026132 GW
2027132 GW
2028122.7 GW
202991.6 GW
20303650 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Leeward Energy's planned MW leans on PJM Interconnection, California ISO (CAISO) and ERCOT. PJM Interconnection alone holds 36% of it.

Figure 2

Planned MW by grid operator

55 planned projects

PJM Interconnection 3.3 GW 20 projects
California ISO (CAISO) 2.1 GW 7 projects
ERCOT 1.6 GW 10 projects
Southwest Power Pool (SPP) 1.5 GW 10 projects
Midcontinent ISO (MISO) 402.3 MW 4 projects
Public Service Company of Colorado 230 MW 1 project
PacifiCorp East 116 MW 2 projects
Tennessee Valley Authority 50 MW 1 project
View as table
GridPlanned projectsPlanned MW
PJM Interconnection203.3 GW
California ISO (CAISO)72.1 GW
ERCOT101.6 GW
Southwest Power Pool (SPP)101.5 GW
Midcontinent ISO (MISO)4402.3 MW
Public Service Company of Colorado1230 MW
PacifiCorp East2116 MW
Tennessee Valley Authority150 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2020 was the biggest year.

01k2k3k 2014 2015 2016 2017 2018 2019 2.1 GW 2020 2021 2022 2023 2024 2025 2026
View as table
Queue yearProjectsMW
20142400 MW
201500 MW
201600 MW
20173308.6 MW
201813 MW
20194630 MW
2020132.1 GW
202131.2 GW
20222380 MW
20233400 MW
20241200 MW
202500 MW
20262500.3 MW
Source. 21 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Leeward Energy's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
8
came online
3
cancelled, inactive or dropped
7
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Leeward EnergyChange: any 20 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
20 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Leeward Energy's pipeline moves.

Request access

Leeward Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Leeward Energy ranks 13 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
13 Leeward Energy this page 55
9.3 GW
13
1.4 GW
0.16

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Leeward Energy

180 people at Leeward Energy

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 88 managers and 36 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

180 contacts

C-Suite 7
Head 1
VP 12
Director 36
Manager 88
Senior 35
Unknown 1
View as table
SeniorityContacts
C-Suite7
Head1
VP12
Director36
Manager88
Senior35
Unknown1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 180 contacts
PersonTitleDepartmentSeniorityContact
180 contacts at Leeward Energy for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Leeward Energy project

All 68 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Leeward EnergySort: MW, largest first 68 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
68 projects and 10.8 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 180 contacts.

Request access

Get alerts for Leeward Energy

We email you when Leeward Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Leeward Energy project and the 180 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.