FieldProspects

Laketricity

Power developer4 projects on record Data as of

Laketricity has 2 planned power projects totaling 49 MW and 2 operating projects totaling 2 MW in the FieldProspects database. 50% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 3 contacts at the company are on file.

49MW
planned, 2 projects
2MW
operating, 2 projects
24.5MW
interconnection agreement signed, 50% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
3
contacts on file
Map

Where Laketricity's planned pipeline sits

Planned MW by state. Everything sits in California.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. California49 MW2 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
24.5MW planned

for every MW Laketricity operates today. Solar is most of the gap.

PlannedOperating
Solar 49 MW
1.6 MW
Battery Storage none
0.4 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar249 MW11.6 MW
Battery Storage00 MW10.4 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed24.5 MW, 50%
1 of 2 planned projects (50%)
Under construction0 MW, 0%
0 of 2 planned projects (0%)
Past due0 MW, 0%
0 of 2 planned projects (0%)
0% of Laketricity's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Laketricity's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0204060 Snapshot year 2026 49 MW 2027
View as table
YearProjectsMW
202600 MW
2027249 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Laketricity's planned MW sits entirely in California ISO (CAISO).

Figure 2

Planned MW by grid operator

2 planned projects

California ISO (CAISO) 49 MW 2 projects
View as table
GridPlanned projectsPlanned MW
California ISO (CAISO)249 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2019 was the biggest year.

0102030 24.5 MW 2019
View as table
Queue yearProjectsMW
2019124.5 MW
Source. 1 project without a queue date is left out MW

Changes since the June 4, 2026 snapshot

What moved in Laketricity's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
2
came online
1
cancelled, inactive or dropped
1
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: LaketricityChange: any 4 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
4 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Laketricity's pipeline moves.

Request access

Laketricity against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Laketricity ranks 690 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
690 Laketricity this page 2
49 MW
2
2 MW
0.04

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Laketricity

3 people at Laketricity

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 2 managers are where interconnection and procurement decisions start.

Figure 4

By seniority

3 contacts

Head 1
Manager 2
View as table
SeniorityContacts
Head1
Manager2
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 3 contacts
PersonTitleDepartmentSeniorityContact
3 contacts at Laketricity for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Laketricity project

All 4 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: LaketricitySort: MW, largest first 4 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
4 projects and 51 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 3 contacts.

Request access

Get alerts for Laketricity

We email you when Laketricity adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Laketricity project and the 3 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.