Key Capture Energy

Power developer23 projects on record Data as of

Key Capture Energy has 21 planned power projects totaling 1.9 GW and 2 operating projects totaling 200 MW in the FieldProspects database. 37% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 59 contacts at the company are on file.

1.9GW
planned, 21 projects
200MW
operating, 2 projects
693.8MW
interconnection agreement signed, 37% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
59
contacts on file
Map

Where Key Capture Energy's planned pipeline sits

Planned MW by state. The 4 largest states hold 1.9 GW of the 1.9 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. New York903.5 MW11 projects, 48% of planned
  2. Texas731 MW7 projects, 39% of planned
  3. Oklahoma200 MW2 projects, 11% of planned
  4. Connecticut45 MW1 project, 2% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
9.4MW planned

for every MW Key Capture Energy operates today. Battery Storage is most of the gap.

PlannedOperating
Battery Storage 1.9 GW
200 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage211.9 GW2200 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed693.8 MW, 37%
7 of 21 planned projects (33%)
Under construction0 MW, 0%
0 of 21 planned projects (0%)
Past due0 MW, 0%
0 of 21 planned projects (0%)
0% of Key Capture Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Key Capture Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
02505007501k Snapshot year 90.4 MW 2026 2027 810.3 MW 2028 2029 2030 2031
View as table
YearProjectsMW
2026290.4 MW
20273400.8 MW
20288810.3 MW
20293260 MW
20303223 MW
2031295 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Key Capture Energy's planned MW leans on New York ISO (NYISO), ERCOT and Southwest Power Pool (SPP). New York ISO (NYISO) alone holds 48% of it.

Figure 2

Planned MW by grid operator

21 planned projects

New York ISO (NYISO) 903.5 MW 11 projects
ERCOT 731 MW 7 projects
Southwest Power Pool (SPP) 200 MW 2 projects
ISO New England 45 MW 1 project
View as table
GridPlanned projectsPlanned MW
New York ISO (NYISO)11903.5 MW
ERCOT7731 MW
Southwest Power Pool (SPP)2200 MW
ISO New England145 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2021 was the biggest year.

0100200300400 2018 2019 2020 322.9 MW 2021 2022 2023 2024 2025 2026
View as table
Queue yearProjectsMW
20181200 MW
20193214 MW
20202179 MW
20214322.9 MW
20222204.3 MW
202300 MW
202400 MW
20251203.8 MW
20262160 MW
Source. 6 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Key Capture Energy's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+2
projects added, 160 MW
0
came online
0
cancelled, inactive or dropped
1
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Key Capture EnergyChange: any 3 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
3 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Key Capture Energy's pipeline moves.

Request access

Key Capture Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Key Capture Energy ranks 92 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
92 Key Capture Energy this page 21
1.9 GW
2
200 MW
0.11

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Key Capture Energy

59 people at Key Capture Energy

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 20 managers and 23 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

59 contacts

C-Suite 2
Head 2
VP 3
Director 23
Manager 20
Senior 9
View as table
SeniorityContacts
C-Suite2
Head2
VP3
Director23
Manager20
Senior9
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 59 contacts
PersonTitleDepartmentSeniorityContact
59 contacts at Key Capture Energy for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Key Capture Energy project

All 23 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Key Capture EnergySort: MW, largest first 23 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
23 projects and 2.1 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 59 contacts.

Request access

Get alerts for Key Capture Energy

We email you when Key Capture Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Key Capture Energy project and the 59 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.