Key Capture Energy
Key Capture Energy has 21 planned power projects totaling 1.9 GW and 2 operating projects totaling 200 MW in the FieldProspects database. 37% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 59 contacts at the company are on file.
Where Key Capture Energy's planned pipeline sits
Planned MW by state. The 4 largest states hold 1.9 GW of the 1.9 GW.
Largest states
- New York903.5 MW11 projects, 48% of planned
- Texas731 MW7 projects, 39% of planned
- Oklahoma200 MW2 projects, 11% of planned
- Connecticut45 MW1 project, 2% of planned
for every MW Key Capture Energy operates today. Battery Storage is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Battery Storage | 21 | 1.9 GW | 2 | 200 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Key Capture Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 2 | 90.4 MW |
| 2027 | 3 | 400.8 MW |
| 2028 | 8 | 810.3 MW |
| 2029 | 3 | 260 MW |
| 2030 | 3 | 223 MW |
| 2031 | 2 | 95 MW |
Pipeline by grid and queue year
Key Capture Energy's planned MW leans on New York ISO (NYISO), ERCOT and Southwest Power Pool (SPP). New York ISO (NYISO) alone holds 48% of it.
Planned MW by grid operator
21 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| New York ISO (NYISO) | 11 | 903.5 MW |
| ERCOT | 7 | 731 MW |
| Southwest Power Pool (SPP) | 2 | 200 MW |
| ISO New England | 1 | 45 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2021 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2018 | 1 | 200 MW |
| 2019 | 3 | 214 MW |
| 2020 | 2 | 179 MW |
| 2021 | 4 | 322.9 MW |
| 2022 | 2 | 204.3 MW |
| 2023 | 0 | 0 MW |
| 2024 | 0 | 0 MW |
| 2025 | 1 | 203.8 MW |
| 2026 | 2 | 160 MW |
Changes since the June 4, 2026 snapshot
What moved in Key Capture Energy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Key Capture Energy's pipeline moves.
Key Capture Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Key Capture Energy ranks 92 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 92 | Key Capture Energy this page | 21 | 2 | 0.11 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Key Capture Energy59 people at Key Capture Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 20 managers and 23 directors are where interconnection and procurement decisions start.
By seniority
59 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 2 |
| Head | 2 |
| VP | 3 |
| Director | 23 |
| Manager | 20 |
| Senior | 9 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Key Capture Energy project
All 23 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 59 contacts.
Get alerts for Key Capture Energy
We email you when Key Capture Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Key Capture Energy project and the 59 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.