Kauai Island Utility Cooperative
Kauai Island Utility Cooperative has 2 planned power projects totaling 24 MW and 13 operating projects totaling 113.5 MW in the FieldProspects database. 0% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date.
Where Kauai Island Utility Cooperative's planned pipeline sits
Planned MW by state. Everything sits in Hawaii.
Largest states
- Hawaii24 MW2 projects, 100% of planned
for every MW Kauai Island Utility Cooperative operates today. Battery Storage is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Battery Storage | 2 | 24 MW | 0 | 0 MW |
| Oil | 0 | 0 MW | 11 | 89.5 MW |
| Solar | 0 | 0 MW | 2 | 24 MW |
MW by technologyBattery Storage has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Kauai Island Utility Cooperative's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 0 | 0 MW |
| 2027 | 2 | 24 MW |
Pipeline by grid and queue year
Kauai Island Utility Cooperative's planned projects list no balancing authority.
Planned MW by grid operator
2 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| No grid listed | 2 | 24 MW |
Changes since the June 4, 2026 snapshot
What moved in Kauai Island Utility Cooperative's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Kauai Island Utility Cooperative's pipeline moves.
Kauai Island Utility Cooperative against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Kauai Island Utility Cooperative ranks 716 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 716 | Kauai Island Utility Cooperative this page | 2 | 13 | 4.73 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Kauai Island Utility CooperativeEvery Kauai Island Utility Cooperative project
All 15 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both.
Get alerts for Kauai Island Utility Cooperative
We email you when Kauai Island Utility Cooperative adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Kauai Island Utility Cooperative project, with its county, dates and queue status.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.