Jupiter Power
Jupiter Power has 47 planned power projects totaling 6.9 GW and 6 operating projects totaling 804.1 MW in the FieldProspects database. 52% of the planned capacity has an interconnection agreement and 3% is past its listed in-service date. 72 contacts at the company are on file.
Where Jupiter Power's planned pipeline sits
Planned MW by state. The 6 largest states hold 6.8 GW of the 6.9 GW.
Largest states
- Texas5 GW35 projects, 73% of planned
- Massachusetts712.2 MW2 projects, 10% of planned
- Michigan400 MW4 projects, 6% of planned
- New Jersey400 MW2 projects, 6% of planned
- Connecticut205.3 MW2 projects, 3% of planned
- Ohio85 MW1 project, 1% of planned
1 more state with less.
for every MW Jupiter Power operates today. Battery Storage is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Battery Storage | 47 | 6.9 GW | 6 | 804.1 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Jupiter Power's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2025 | 2 | 200 MW |
| 2026 | 7 | 1.4 GW |
| 2027 | 13 | 1.3 GW |
| 2028 | 14 | 2.5 GW |
| 2029 | 9 | 896.8 MW |
| 2030 | 1 | 301 MW |
| 2031 | 1 | 250 MW |
Pipeline by grid and queue year
Jupiter Power's planned MW leans on ERCOT, ISO New England and PJM Interconnection. ERCOT alone holds 70% of it.
Planned MW by grid operator
47 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 34 | 4.8 GW |
| ISO New England | 4 | 917.6 MW |
| PJM Interconnection | 4 | 565 MW |
| Midcontinent ISO (MISO) | 4 | 400 MW |
| Southwest Power Pool (SPP) | 1 | 200 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2025 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2020 | 8 | 1.3 GW |
| 2021 | 7 | 1.4 GW |
| 2022 | 0 | 0 MW |
| 2023 | 0 | 0 MW |
| 2024 | 5 | 719 MW |
| 2025 | 20 | 2 GW |
| 2026 | 2 | 401.4 MW |
Changes since the June 4, 2026 snapshot
What moved in Jupiter Power's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Jupiter Power's pipeline moves.
Jupiter Power against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Jupiter Power ranks 22 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 22 | Jupiter Power this page | 47 | 6 | 0.12 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Jupiter Power72 people at Jupiter Power
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 31 managers and 16 directors are where interconnection and procurement decisions start.
By seniority
72 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 4 |
| Head | 1 |
| VP | 15 |
| Director | 16 |
| Manager | 31 |
| Senior | 5 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Jupiter Power project
All 53 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 72 contacts.
Get alerts for Jupiter Power
We email you when Jupiter Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Jupiter Power project and the 72 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.