Jupiter Power

Power developer53 projects on record Data as of

Jupiter Power has 47 planned power projects totaling 6.9 GW and 6 operating projects totaling 804.1 MW in the FieldProspects database. 52% of the planned capacity has an interconnection agreement and 3% is past its listed in-service date. 72 contacts at the company are on file.

6.9GW
planned, 47 projects
804.1MW
operating, 6 projects
3.6GW
interconnection agreement signed, 52% of planned
1.1GW
under construction, 6 projects
200MW
past due, 2 projects
72
contacts on file
Map

Where Jupiter Power's planned pipeline sits

Planned MW by state. The 6 largest states hold 6.8 GW of the 6.9 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas5 GW35 projects, 73% of planned
  2. Massachusetts712.2 MW2 projects, 10% of planned
  3. Michigan400 MW4 projects, 6% of planned
  4. New Jersey400 MW2 projects, 6% of planned
  5. Connecticut205.3 MW2 projects, 3% of planned
  6. Ohio85 MW1 project, 1% of planned

1 more state with less.

Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
8.5MW planned

for every MW Jupiter Power operates today. Battery Storage is most of the gap.

PlannedOperating
Battery Storage 6.9 GW
804.1 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage476.9 GW6804.1 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed3.6 GW, 52%
20 of 47 planned projects (43%)
Under construction1.1 GW, 16%
6 of 47 planned projects (13%)
Past due200 MW, 3%
2 of 47 planned projects (4%)
3% of Jupiter Power's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Jupiter Power's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
01k2k3k Snapshot year 2025 1.4 GW 2026 2027 2.5 GW 2028 2029 2030 2031
View as table
YearProjectsMW
20252200 MW
202671.4 GW
2027131.3 GW
2028142.5 GW
20299896.8 MW
20301301 MW
20311250 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Jupiter Power's planned MW leans on ERCOT, ISO New England and PJM Interconnection. ERCOT alone holds 70% of it.

Figure 2

Planned MW by grid operator

47 planned projects

ERCOT 4.8 GW 34 projects
ISO New England 917.6 MW 4 projects
PJM Interconnection 565 MW 4 projects
Midcontinent ISO (MISO) 400 MW 4 projects
Southwest Power Pool (SPP) 200 MW 1 project
View as table
GridPlanned projectsPlanned MW
ERCOT344.8 GW
ISO New England4917.6 MW
PJM Interconnection4565 MW
Midcontinent ISO (MISO)4400 MW
Southwest Power Pool (SPP)1200 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2025 was the biggest year.

01k2k3k 2020 2021 2022 2023 2024 2 GW 2025 2026
View as table
Queue yearProjectsMW
202081.3 GW
202171.4 GW
202200 MW
202300 MW
20245719 MW
2025202 GW
20262401.4 MW
Source. 5 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Jupiter Power's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
2
cancelled, inactive or dropped
11
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Jupiter PowerChange: any 13 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
13 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Jupiter Power's pipeline moves.

Request access

Jupiter Power against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Jupiter Power ranks 22 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
22 Jupiter Power this page 47
6.9 GW
6
804.1 MW
0.12

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Jupiter Power

72 people at Jupiter Power

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 31 managers and 16 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

72 contacts

C-Suite 4
Head 1
VP 15
Director 16
Manager 31
Senior 5
View as table
SeniorityContacts
C-Suite4
Head1
VP15
Director16
Manager31
Senior5
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 72 contacts
PersonTitleDepartmentSeniorityContact
72 contacts at Jupiter Power for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Jupiter Power project

All 53 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Jupiter PowerSort: MW, largest first 53 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
53 projects and 7.7 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 72 contacts.

Request access

Get alerts for Jupiter Power

We email you when Jupiter Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Jupiter Power project and the 72 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.