ION Solar
ION Solar has 2 planned power projects totaling 801.2 MW in the FieldProspects database and no operating project on record. 0% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 102 contacts at the company are on file.
Where ION Solar's planned pipeline sits
Planned MW by state. Everything sits in Texas.
Largest states
- Texas801.2 MW2 projects, 100% of planned
and no operating project on record yet. Everything here is pipeline.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 1 | 600.9 MW | 0 | 0 MW |
| Battery Storage | 1 | 200.3 MW | 0 | 0 MW |
MW by technologySolar and Battery Storage have no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of ION Solar's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 0 | 0 MW |
| 2027 | 0 | 0 MW |
| 2028 | 2 | 801.2 MW |
Pipeline by grid and queue year
ION Solar's planned MW sits entirely in ERCOT.
Planned MW by grid operator
2 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 2 | 801.2 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2025 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2025 | 2 | 801.2 MW |
Changes since the June 4, 2026 snapshot
What moved in ION Solar's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when ION Solar's pipeline moves.
ION Solar against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. ION Solar ranks 200 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 200 | ION Solar this page | 2 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus ION Solar102 people at ION Solar
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 71 managers and 15 directors are where interconnection and procurement decisions start.
By seniority
102 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 2 |
| Founder | 1 |
| Owner | 2 |
| Head | 1 |
| VP | 6 |
| Director | 15 |
| Manager | 71 |
| Senior | 4 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every ION Solar project
All 2 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 102 contacts.
Get alerts for ION Solar
We email you when ION Solar adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every ION Solar project and the 102 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.