Innovative Solar Systems has 4 planned power projects totaling 760 MW in the FieldProspects database and no operating project on record. 0% of the planned capacity has an interconnection agreement and 50% is past its listed in-service date. 3 contacts at the company are on file.
Where Innovative Solar Systems' planned pipeline sits
Planned MW by state. Everything sits in Texas.
Largest states
- Texas760 MW4 projects, 100% of planned
and no operating project on record yet. Everything here is pipeline.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 3 | 580 MW | 0 | 0 MW |
| Battery Storage | 1 | 180 MW | 0 | 0 MW |
MW by technologySolar and Battery Storage have no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Innovative Solar Systems' planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2025 | 2 | 380 MW |
| 2026 | 0 | 0 MW |
| 2027 | 1 | 180 MW |
| 2028 | 1 | 200 MW |
Pipeline by grid and queue year
Innovative Solar Systems' planned MW sits entirely in ERCOT.
Planned MW by grid operator
4 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 4 | 760 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2020 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2019 | 1 | 180 MW |
| 2020 | 1 | 200 MW |
Changes since the June 4, 2026 snapshot
What moved in Innovative Solar Systems' queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Innovative Solar Systems' pipeline moves.
Innovative Solar Systems against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Innovative Solar Systems ranks 213 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 213 | Innovative Solar Systems this page | 4 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Innovative Solar Systems3 people at Innovative Solar Systems
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 2 managers are where interconnection and procurement decisions start.
By seniority
3 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 1 |
| Manager | 2 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Innovative Solar Systems project
All 4 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 3 contacts.
Get alerts for Innovative Solar Systems
We email you when Innovative Solar Systems adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Innovative Solar Systems project and the 3 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.