Innergex

Power developer6 projects on record Data as of

Innergex has 4 planned power projects totaling 751.2 MW and 2 operating projects totaling 74 MW in the FieldProspects database. 60% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 15 contacts at the company are on file.

751.2MW
planned, 4 projects
74MW
operating, 2 projects
450MW
interconnection agreement signed, 60% of planned
450MW
under construction, 3 projects
0MW
past due, 0 projects
15
contacts on file
Map

Where Innergex's planned pipeline sits

Planned MW by state. The 2 largest states hold 751.2 MW of the 751.2 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Ohio450 MW3 projects, 60% of planned
  2. Texas301.2 MW1 project, 40% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
10.2MW planned

for every MW Innergex operates today. Solar is most of the gap.

PlannedOperating
Solar 751.2 MW
44 MW
Battery Storage none
30 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar4751.2 MW144 MW
Battery Storage00 MW130 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed450 MW, 60%
3 of 4 planned projects (75%)
Under construction450 MW, 60%
3 of 4 planned projects (75%)
Past due0 MW, 0%
0 of 4 planned projects (0%)
0% of Innergex's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Innergex's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0200400600 Snapshot year 2026 450 MW 2027 2028
View as table
YearProjectsMW
202600 MW
20273450 MW
20281301.2 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Innergex's planned MW leans on PJM Interconnection and ERCOT. PJM Interconnection alone holds 60% of it.

Figure 2

Planned MW by grid operator

4 planned projects

PJM Interconnection 450 MW 3 projects
ERCOT 301.2 MW 1 project
View as table
GridPlanned projectsPlanned MW
PJM Interconnection3450 MW
ERCOT1301.2 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2024 was the biggest year.

0100200300400 2020 2021 2022 2023 301.2 MW 2024
View as table
Queue yearProjectsMW
20202250 MW
202100 MW
202200 MW
202300 MW
20241301.2 MW
Source. 1 project without a queue date is left out MW

Innergex against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Innergex ranks 218 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
218 Innergex this page 4
751.2 MW
2
74 MW
0.10

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Innergex

15 people at Innergex

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 9 managers and 3 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

15 contacts

Director 3
Manager 9
Senior 3
View as table
SeniorityContacts
Director3
Manager9
Senior3
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 15 contacts
PersonTitleDepartmentSeniorityContact
15 contacts at Innergex for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Innergex project

All 6 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: InnergexSort: MW, largest first 6 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
6 projects and 825.2 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 15 contacts.

Request access

Get alerts for Innergex

We email you when Innergex adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Innergex project and the 15 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.