Innergex
Innergex has 4 planned power projects totaling 751.2 MW and 2 operating projects totaling 74 MW in the FieldProspects database. 60% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 15 contacts at the company are on file.
Where Innergex's planned pipeline sits
Planned MW by state. The 2 largest states hold 751.2 MW of the 751.2 MW.
for every MW Innergex operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 4 | 751.2 MW | 1 | 44 MW |
| Battery Storage | 0 | 0 MW | 1 | 30 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Innergex's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 0 | 0 MW |
| 2027 | 3 | 450 MW |
| 2028 | 1 | 301.2 MW |
Pipeline by grid and queue year
Innergex's planned MW leans on PJM Interconnection and ERCOT. PJM Interconnection alone holds 60% of it.
Planned MW by grid operator
4 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| PJM Interconnection | 3 | 450 MW |
| ERCOT | 1 | 301.2 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2024 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2020 | 2 | 250 MW |
| 2021 | 0 | 0 MW |
| 2022 | 0 | 0 MW |
| 2023 | 0 | 0 MW |
| 2024 | 1 | 301.2 MW |
Innergex against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Innergex ranks 218 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 218 | Innergex this page | 4 | 2 | 0.10 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Innergex15 people at Innergex
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 9 managers and 3 directors are where interconnection and procurement decisions start.
By seniority
15 contacts
View as table
| Seniority | Contacts |
|---|---|
| Director | 3 |
| Manager | 9 |
| Senior | 3 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Innergex project
All 6 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 15 contacts.
Get alerts for Innergex
We email you when Innergex adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Innergex project and the 15 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.