FieldProspects

Idemitsu Renewables

Power developer4 projects on record Data as of

Idemitsu Renewables has 2 planned power projects totaling 141.2 MW and 2 operating projects totaling 98 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 15 contacts at the company are on file.

141.2MW
planned, 2 projects
98MW
operating, 2 projects
141.2MW
interconnection agreement signed, 100% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
15
contacts on file
Map

Where Idemitsu Renewables' planned pipeline sits

Planned MW by state. Everything sits in California.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. California141.2 MW2 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
1.4MW planned

for every MW Idemitsu Renewables operates today. Battery Storage is most of the gap.

PlannedOperating
Solar 71.2 MW
60 MW
Battery Storage 70 MW
38 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar171.2 MW160 MW
Battery Storage170 MW138 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed141.2 MW, 100%
2 of 2 planned projects (100%)
Under construction0 MW, 0%
0 of 2 planned projects (0%)
Past due0 MW, 0%
0 of 2 planned projects (0%)
0% of Idemitsu Renewables' planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Idemitsu Renewables' planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
050100150 Snapshot year 2026 141.2 MW 2027
View as table
YearProjectsMW
202600 MW
20272141.2 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Idemitsu Renewables' planned MW sits entirely in California ISO (CAISO).

Figure 2

Planned MW by grid operator

2 planned projects

California ISO (CAISO) 141.2 MW 2 projects
View as table
GridPlanned projectsPlanned MW
California ISO (CAISO)2141.2 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2018 was the biggest year.

050100150 141.2 MW 2018
View as table
Queue yearProjectsMW
20182141.2 MW
Source. Every planned project has a queue date MW

Changes since the June 4, 2026 snapshot

What moved in Idemitsu Renewables' queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
2
came online
0
cancelled, inactive or dropped
2
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Idemitsu RenewablesChange: any 4 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
4 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Idemitsu Renewables' pipeline moves.

Request access

Idemitsu Renewables against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Idemitsu Renewables ranks 577 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
577 Idemitsu Renewables this page 2
141.2 MW
2
98 MW
0.69

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Idemitsu Renewables

15 people at Idemitsu Renewables

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 4 managers and 7 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

15 contacts

C-Suite 1
Director 7
Manager 4
Senior 2
Entry 1
View as table
SeniorityContacts
C-Suite1
Director7
Manager4
Senior2
Entry1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 15 contacts
PersonTitleDepartmentSeniorityContact
15 contacts at Idemitsu Renewables for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Idemitsu Renewables project

All 4 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Idemitsu RenewablesSort: MW, largest first 4 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
4 projects and 239.2 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 15 contacts.

Request access

Get alerts for Idemitsu Renewables

We email you when Idemitsu Renewables adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Idemitsu Renewables project and the 15 people behind them.