Idemitsu Renewables
Idemitsu Renewables has 2 planned power projects totaling 141.2 MW and 2 operating projects totaling 98 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 15 contacts at the company are on file.
Where Idemitsu Renewables' planned pipeline sits
Planned MW by state. Everything sits in California.
Largest states
- California141.2 MW2 projects, 100% of planned
for every MW Idemitsu Renewables operates today. Battery Storage is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 1 | 71.2 MW | 1 | 60 MW |
| Battery Storage | 1 | 70 MW | 1 | 38 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Idemitsu Renewables' planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 0 | 0 MW |
| 2027 | 2 | 141.2 MW |
Pipeline by grid and queue year
Idemitsu Renewables' planned MW sits entirely in California ISO (CAISO).
Planned MW by grid operator
2 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| California ISO (CAISO) | 2 | 141.2 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2018 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2018 | 2 | 141.2 MW |
Changes since the June 4, 2026 snapshot
What moved in Idemitsu Renewables' queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Idemitsu Renewables' pipeline moves.
Idemitsu Renewables against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Idemitsu Renewables ranks 577 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 577 | Idemitsu Renewables this page | 2 | 2 | 0.69 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Idemitsu Renewables15 people at Idemitsu Renewables
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 4 managers and 7 directors are where interconnection and procurement decisions start.
By seniority
15 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 1 |
| Director | 7 |
| Manager | 4 |
| Senior | 2 |
| Entry | 1 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Idemitsu Renewables project
All 4 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 15 contacts.
Get alerts for Idemitsu Renewables
We email you when Idemitsu Renewables adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Idemitsu Renewables project and the 15 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.