FieldProspects

Hunt Energy

Power developer23 projects on record Data as of

Hunt Energy has 5 planned power projects totaling 513.4 MW and 18 operating projects totaling 178.2 MW in the FieldProspects database. 39% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 1 state and 2 technologies.

513.4MW
planned, 5 projects
178.2MW
operating, 18 projects
201.4MW
interconnection agreement signed, 39% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
1
state
Map

Where Hunt Energy's planned pipeline sits

Planned MW by state. Everything sits in Texas.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas513.4 MW5 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
2.9MW planned

for every MW Hunt Energy operates today. Battery Storage is most of the gap.

PlannedOperating
Battery Storage 361.5 MW
178.2 MW
Oil 151.9 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage2361.5 MW18178.2 MW
Oil3151.9 MW00 MW

MW by technologyOil has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed201.4 MW, 39%
3 of 5 planned projects (60%)
Under construction0 MW, 0%
0 of 5 planned projects (0%)
Past due0 MW, 0%
0 of 5 planned projects (0%)
0% of Hunt Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Hunt Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0100200300400 Snapshot year 19.9 MW 2026 313.5 MW 2027 2028 2029
View as table
YearProjectsMW
2026219.9 MW
20272313.5 MW
202800 MW
20291180 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Hunt Energy's planned MW sits entirely in ERCOT.

Figure 2

Planned MW by grid operator

5 planned projects

ERCOT 513.4 MW 5 projects
View as table
GridPlanned projectsPlanned MW
ERCOT5513.4 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2024 was the biggest year.

0200400600 513.4 MW 2024
View as table
Queue yearProjectsMW
20245513.4 MW
Source. Every planned project has a queue date MW

Hunt Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Hunt Energy ranks 270 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
270 Hunt Energy this page 5
513.4 MW
18
178.2 MW
0.35

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Hunt Energy

Every Hunt Energy project

All 23 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Hunt EnergySort: MW, largest first 23 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
23 projects and 691.6 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Hunt Energy

We email you when Hunt Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Hunt Energy project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.