Hunt Energy
Hunt Energy has 5 planned power projects totaling 513.4 MW and 18 operating projects totaling 178.2 MW in the FieldProspects database. 39% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 1 state and 2 technologies.
Where Hunt Energy's planned pipeline sits
Planned MW by state. Everything sits in Texas.
Largest states
- Texas513.4 MW5 projects, 100% of planned
for every MW Hunt Energy operates today. Battery Storage is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Battery Storage | 2 | 361.5 MW | 18 | 178.2 MW |
| Oil | 3 | 151.9 MW | 0 | 0 MW |
MW by technologyOil has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Hunt Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 2 | 19.9 MW |
| 2027 | 2 | 313.5 MW |
| 2028 | 0 | 0 MW |
| 2029 | 1 | 180 MW |
Pipeline by grid and queue year
Hunt Energy's planned MW sits entirely in ERCOT.
Planned MW by grid operator
5 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 5 | 513.4 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2024 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2024 | 5 | 513.4 MW |
Hunt Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Hunt Energy ranks 270 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 270 | Hunt Energy this page | 5 | 18 | 0.35 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Hunt EnergyEvery Hunt Energy project
All 23 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both.
Get alerts for Hunt Energy
We email you when Hunt Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Hunt Energy project, with its county, dates and queue status.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.