Homer City Generation, L.P.
Homer City Generation, L.P. has 2 planned power projects totaling 4.4 GW in the FieldProspects database and no operating project on record. 0% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 1 state and 1 technology.
Where Homer City Generation, L.P.'s planned pipeline sits
Planned MW by state. Everything sits in Pennsylvania.
Largest states
- Pennsylvania4.4 GW2 projects, 100% of planned
and no operating project on record yet. Everything here is pipeline.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Natural Gas | 2 | 4.4 GW | 0 | 0 MW |
MW by technologyNatural Gas has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Homer City Generation, L.P.'s planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 0 | 0 MW |
Pipeline by grid and queue year
Homer City Generation, L.P.'s planned MW sits entirely in New York ISO (NYISO).
Planned MW by grid operator
2 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| New York ISO (NYISO) | 2 | 4.4 GW |
When the planned projects entered the queue
Planned MW by queue request year. 2026 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2026 | 2 | 4.4 GW |
Changes since the June 4, 2026 snapshot
What moved in Homer City Generation, L.P.'s queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Homer City Generation, L.P.'s pipeline moves.
Homer City Generation, L.P. against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Homer City Generation, L.P. ranks 37 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 37 | Homer City Generation, L.P. this page | 2 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Homer City Generation, L.P.Every Homer City Generation, L.P. project
All 2 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both.
Get alerts for Homer City Generation, L.P.
We email you when Homer City Generation, L.P. adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Homer City Generation, L.P. project, with its county, dates and queue status.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.