High Road Clean Energy
High Road Clean Energy has 4 planned power projects totaling 918 MW in the FieldProspects database and no operating project on record. 42% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 3 contacts at the company are on file.
Where High Road Clean Energy's planned pipeline sits
Planned MW by state. Everything sits in Texas.
Largest states
- Texas918 MW4 projects, 100% of planned
and no operating project on record yet. Everything here is pipeline.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 2 | 612 MW | 0 | 0 MW |
| Battery Storage | 2 | 306 MW | 0 | 0 MW |
MW by technologySolar and Battery Storage have no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of High Road Clean Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 0 | 0 MW |
| 2027 | 0 | 0 MW |
| 2028 | 4 | 918 MW |
Pipeline by grid and queue year
High Road Clean Energy's planned MW sits entirely in ERCOT.
Planned MW by grid operator
4 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 4 | 918 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2025 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2025 | 4 | 918 MW |
Changes since the June 4, 2026 snapshot
What moved in High Road Clean Energy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when High Road Clean Energy's pipeline moves.
High Road Clean Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. High Road Clean Energy ranks 186 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 186 | High Road Clean Energy this page | 4 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus High Road Clean Energy3 people at High Road Clean Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 2 directors are where interconnection and procurement decisions start.
By seniority
3 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 1 |
| Director | 2 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every High Road Clean Energy project
All 4 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 3 contacts.
Get alerts for High Road Clean Energy
We email you when High Road Clean Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every High Road Clean Energy project and the 3 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.