Power developer4 projects on record Data as of

High Road Clean Energy has 4 planned power projects totaling 918 MW in the FieldProspects database and no operating project on record. 42% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 3 contacts at the company are on file.

918MW
planned, 4 projects
0MW
operating, 0 projects
382.5MW
interconnection agreement signed, 42% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
3
contacts on file
Map

Where High Road Clean Energy's planned pipeline sits

Planned MW by state. Everything sits in Texas.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas918 MW4 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
918 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Solar 612 MW
none
Battery Storage 306 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar2612 MW00 MW
Battery Storage2306 MW00 MW

MW by technologySolar and Battery Storage have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed382.5 MW, 42%
2 of 4 planned projects (50%)
Under construction0 MW, 0%
0 of 4 planned projects (0%)
Past due0 MW, 0%
0 of 4 planned projects (0%)
0% of High Road Clean Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of High Road Clean Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
02505007501k Snapshot year 2026 2027 918 MW 2028
View as table
YearProjectsMW
202600 MW
202700 MW
20284918 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

High Road Clean Energy's planned MW sits entirely in ERCOT.

Figure 2

Planned MW by grid operator

4 planned projects

ERCOT 918 MW 4 projects
View as table
GridPlanned projectsPlanned MW
ERCOT4918 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2025 was the biggest year.

02505007501k 918 MW 2025
View as table
Queue yearProjectsMW
20254918 MW
Source. Every planned project has a queue date MW

Changes since the June 4, 2026 snapshot

What moved in High Road Clean Energy's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
0
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: High Road Clean EnergyChange: any 2 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
2 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when High Road Clean Energy's pipeline moves.

Request access

High Road Clean Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. High Road Clean Energy ranks 186 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
186 High Road Clean Energy this page 4
918 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus High Road Clean Energy

3 people at High Road Clean Energy

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 2 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

3 contacts

C-Suite 1
Director 2
View as table
SeniorityContacts
C-Suite1
Director2
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 3 contacts
PersonTitleDepartmentSeniorityContact
3 contacts at High Road Clean Energy for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every High Road Clean Energy project

All 4 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: High Road Clean EnergySort: MW, largest first 4 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
4 projects and 918 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 3 contacts.

Request access

Get alerts for High Road Clean Energy

We email you when High Road Clean Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every High Road Clean Energy project and the 3 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.