Hexagon Energy
Hexagon Energy has 14 planned power projects totaling 3.6 GW in the FieldProspects database and no operating project on record. 39% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 16 contacts at the company are on file.
Where Hexagon Energy's planned pipeline sits
Planned MW by state. The 4 largest states hold 3.6 GW of the 3.6 GW.
and no operating project on record yet. Everything here is pipeline.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 6 | 2.6 GW | 0 | 0 MW |
| Battery Storage | 8 | 1 GW | 0 | 0 MW |
MW by technologySolar and Battery Storage have no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Hexagon Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 0 | 0 MW |
| 2027 | 7 | 845.7 MW |
| 2028 | 3 | 303.6 MW |
| 2029 | 1 | 1.2 GW |
| 2030 | 0 | 0 MW |
| 2031 | 3 | 1.3 GW |
Pipeline by grid and queue year
Hexagon Energy's planned MW leans on PJM Interconnection, ERCOT and New York ISO (NYISO). PJM Interconnection alone holds 72% of it.
Planned MW by grid operator
14 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| PJM Interconnection | 5 | 2.6 GW |
| ERCOT | 8 | 1 GW |
| New York ISO (NYISO) | 1 | 2 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2023 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2019 | 2 | 438 MW |
| 2020 | 2 | 1 GW |
| 2021 | 0 | 0 MW |
| 2022 | 0 | 0 MW |
| 2023 | 8 | 1 GW |
Hexagon Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Hexagon Energy ranks 44 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 44 | Hexagon Energy this page | 14 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Hexagon Energy16 people at Hexagon Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 6 managers and 1 director are where interconnection and procurement decisions start.
By seniority
16 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 3 |
| VP | 4 |
| Director | 1 |
| Manager | 6 |
| Senior | 2 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Hexagon Energy project
All 14 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 16 contacts.
Get alerts for Hexagon Energy
We email you when Hexagon Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Hexagon Energy project and the 16 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.