Power developer3 projects on record Data as of

hep Solar has 3 planned power projects totaling 168.4 MW in the FieldProspects database and no operating project on record. 90% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 3 states and 1 technology.

168.4MW
planned, 3 projects
0MW
operating, 0 projects
152.4MW
interconnection agreement signed, 90% of planned
15.4MW
under construction, 1 project
0MW
past due, 0 projects
3
states
Map

Where hep Solar's planned pipeline sits

Planned MW by state. The 3 largest states hold 168.4 MW of the 168.4 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas137 MW1 project, 81% of planned
  2. South Carolina16 MW1 project, 10% of planned
  3. New Jersey15.4 MW1 project, 9% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
168.4 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Solar 168.4 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar3168.4 MW00 MW

MW by technologySolar has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed152.4 MW, 90%
2 of 3 planned projects (67%)
Under construction15.4 MW, 9%
1 of 3 planned projects (33%)
Past due0 MW, 0%
0 of 3 planned projects (0%)
0% of hep Solar's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of hep Solar's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
050100150200 Snapshot year 15.4 MW 2026 153 MW 2027
View as table
YearProjectsMW
2026115.4 MW
20272153 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

hep Solar's planned MW leans on ERCOT, Duke Energy Progress East and PJM Interconnection. ERCOT alone holds 81% of it.

Figure 2

Planned MW by grid operator

3 planned projects

ERCOT 137 MW 1 project
Duke Energy Progress East 16 MW 1 project
PJM Interconnection 15.4 MW 1 project
View as table
GridPlanned projectsPlanned MW
ERCOT1137 MW
Duke Energy Progress East116 MW
PJM Interconnection115.4 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2021 was the biggest year.

050100150 2020 137 MW 2021
View as table
Queue yearProjectsMW
2020115.4 MW
20211137 MW
Source. 1 project without a queue date is left out MW

Changes since the June 4, 2026 snapshot

What moved in hep Solar's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
2
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: hep SolarChange: any 2 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
2 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when hep Solar's pipeline moves.

Request access

hep Solar against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. hep Solar ranks 550 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
550 hep Solar this page 3
168.4 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus hep Solar

Every hep Solar project

All 3 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: hep SolarSort: MW, largest first 3 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
3 projects and 168.4 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for hep Solar

We email you when hep Solar adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every hep Solar project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.