Heelstone Renewable Energy
Heelstone Renewable Energy has 11 planned power projects totaling 1.2 GW and 1 operating project totaling 38 MW in the FieldProspects database. 73% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 5 states and 2 technologies.
Where Heelstone Renewable Energy's planned pipeline sits
Planned MW by state. The 5 largest states hold 1.2 GW of the 1.2 GW.
for every MW Heelstone Renewable Energy operates today. Solar + Storage (Hybrid) is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar + Storage (Hybrid) | 4 | 800 MW | 0 | 0 MW |
| Solar | 7 | 386 MW | 1 | 38 MW |
MW by technologySolar + Storage (Hybrid) has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Heelstone Renewable Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 3 | 126 MW |
| 2027 | 4 | 260 MW |
| 2028 | 3 | 325 MW |
| 2029 | 1 | 475 MW |
Pipeline by grid and queue year
Heelstone Renewable Energy's planned MW leans on Southwest Power Pool (SPP), PJM Interconnection and Midcontinent ISO (MISO). Southwest Power Pool (SPP) alone holds 67% of it.
Planned MW by grid operator
11 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| Southwest Power Pool (SPP) | 4 | 800 MW |
| PJM Interconnection | 3 | 220 MW |
| Midcontinent ISO (MISO) | 3 | 86 MW |
| Southern Company | 1 | 80 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2023 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2019 | 1 | 85 MW |
| 2020 | 1 | 50 MW |
| 2021 | 0 | 0 MW |
| 2022 | 0 | 0 MW |
| 2023 | 4 | 800 MW |
Changes since the June 4, 2026 snapshot
What moved in Heelstone Renewable Energy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Heelstone Renewable Energy's pipeline moves.
Heelstone Renewable Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Heelstone Renewable Energy ranks 144 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 144 | Heelstone Renewable Energy this page | 11 | 1 | 0.03 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Heelstone Renewable EnergyEvery Heelstone Renewable Energy project
All 12 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both.
Get alerts for Heelstone Renewable Energy
We email you when Heelstone Renewable Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Heelstone Renewable Energy project, with its county, dates and queue status.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.