Headwater Energy
Headwater Energy has 8 planned power projects totaling 842 MW and 5 operating projects totaling 11 MW in the FieldProspects database. 76% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 15 contacts at the company are on file.
Where Headwater Energy's planned pipeline sits
Planned MW by state. The 2 largest states hold 842 MW of the 842 MW.
Largest states
- Texas608.6 MW3 projects, 72% of planned
- North Carolina233.4 MW5 projects, 28% of planned
for every MW Headwater Energy operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 7 | 636.6 MW | 5 | 11 MW |
| Battery Storage | 1 | 205.4 MW | 0 | 0 MW |
MW by technologyBattery Storage has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Headwater Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 3 | 73.4 MW |
| 2027 | 2 | 160 MW |
| 2028 | 3 | 608.6 MW |
Pipeline by grid and queue year
Headwater Energy's planned MW leans on ERCOT and Duke Energy Progress East. ERCOT alone holds 72% of it.
Planned MW by grid operator
8 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 3 | 608.6 MW |
| Duke Energy Progress East | 5 | 233.4 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2022 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2016 | 1 | 201.5 MW |
| 2017 | 0 | 0 MW |
| 2018 | 0 | 0 MW |
| 2019 | 0 | 0 MW |
| 2020 | 1 | 201.7 MW |
| 2021 | 0 | 0 MW |
| 2022 | 1 | 205.4 MW |
Changes since the June 4, 2026 snapshot
What moved in Headwater Energy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Headwater Energy's pipeline moves.
Headwater Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Headwater Energy ranks 196 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 196 | Headwater Energy this page | 8 | 5 | 0.01 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Headwater Energy15 people at Headwater Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 4 managers and 2 directors are where interconnection and procurement decisions start.
By seniority
15 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 3 |
| Head | 1 |
| VP | 2 |
| Director | 2 |
| Manager | 4 |
| Senior | 3 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Headwater Energy project
All 13 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 15 contacts.
Get alerts for Headwater Energy
We email you when Headwater Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Headwater Energy project and the 15 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.