Hanwha Group
Hanwha Group has 9 planned power projects totaling 5.7 GW and 2 operating projects totaling 117.3 MW in the FieldProspects database. 88% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 10 contacts at the company are on file.
Where Hanwha Group's planned pipeline sits
Planned MW by state. The 2 largest states hold 5.7 GW of the 5.7 GW.
for every MW Hanwha Group operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 4 | 3 GW | 1 | 65.3 MW |
| Battery Storage | 5 | 2.7 GW | 1 | 52 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Hanwha Group's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 1 | 300 MW |
| 2027 | 1 | 238.2 MW |
| 2028 | 5 | 4.7 GW |
| 2029 | 2 | 456 MW |
Pipeline by grid and queue year
Hanwha Group's planned MW leans on California ISO (CAISO), ERCOT and Arizona Public Service. California ISO (CAISO) alone holds 78% of it.
Planned MW by grid operator
9 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| California ISO (CAISO) | 2 | 4.4 GW |
| ERCOT | 6 | 934.9 MW |
| Arizona Public Service | 1 | 300 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2017 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2017 | 2 | 4.4 GW |
| 2018 | 0 | 0 MW |
| 2019 | 0 | 0 MW |
| 2020 | 0 | 0 MW |
| 2021 | 0 | 0 MW |
| 2022 | 2 | 329 MW |
| 2023 | 1 | 150 MW |
| 2024 | 1 | 0 MW |
| 2025 | 2 | 456 MW |
Changes since the June 4, 2026 snapshot
What moved in Hanwha Group's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Hanwha Group's pipeline moves.
Hanwha Group against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Hanwha Group ranks 28 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 28 | Hanwha Group this page | 9 | 2 | 0.02 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Hanwha Group10 people at Hanwha Group
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 8 managers are where interconnection and procurement decisions start.
By seniority
10 contacts
View as table
| Seniority | Contacts |
|---|---|
| VP | 2 |
| Manager | 8 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Hanwha Group project
All 11 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 10 contacts.
Get alerts for Hanwha Group
We email you when Hanwha Group adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Hanwha Group project and the 10 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.