GulfStar Power
GulfStar Power has 3 planned power projects totaling 757.1 MW and 1 operating project totaling 300 MW in the FieldProspects database. 60% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 1 contact at the company are on file.
Where GulfStar Power's planned pipeline sits
Planned MW by state. Everything sits in Texas.
Largest states
- Texas757.1 MW3 projects, 100% of planned
for every MW GulfStar Power operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 2 | 451.6 MW | 0 | 0 MW |
| Battery Storage | 1 | 305.5 MW | 1 | 300 MW |
MW by technologySolar has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of GulfStar Power's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 1 | 451.6 MW |
| 2027 | 2 | 305.5 MW |
Pipeline by grid and queue year
GulfStar Power's planned MW sits entirely in ERCOT.
Planned MW by grid operator
3 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 3 | 757.1 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2025 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2025 | 2 | 305.5 MW |
Changes since the June 4, 2026 snapshot
What moved in GulfStar Power's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when GulfStar Power's pipeline moves.
GulfStar Power against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. GulfStar Power ranks 216 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 216 | GulfStar Power this page | 3 | 1 | 0.40 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus GulfStar Power1 person at GulfStar Power
Contacts with title, seniority, department, email and LinkedIn, counted here and never named.
By seniority
1 contact
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 1 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every GulfStar Power project
All 4 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 1 contact.
Get alerts for GulfStar Power
We email you when GulfStar Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every GulfStar Power project and the 1 person behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.