Guadalupe Peaking Energy Center, LLC
Guadalupe Peaking Energy Center, LLC has 1 planned power project totaling 450 MW in the FieldProspects database and no operating project on record. 0% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date.
Where Guadalupe Peaking Energy Center, LLC's planned pipeline sits
Planned MW by state. Everything sits in Texas.
Largest states
- Texas450 MW1 project, 100% of planned
and no operating project on record yet. Everything here is pipeline.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Natural Gas | 1 | 450 MW | 0 | 0 MW |
MW by technologyNatural Gas has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Guadalupe Peaking Energy Center, LLC's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 0 | 0 MW |
| 2027 | 0 | 0 MW |
| 2028 | 0 | 0 MW |
| 2029 | 0 | 0 MW |
| 2030 | 1 | 450 MW |
Pipeline by grid and queue year
Guadalupe Peaking Energy Center, LLC's planned MW sits entirely in ERCOT.
Planned MW by grid operator
1 planned project
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 1 | 450 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2021 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2021 | 1 | 450 MW |
Changes since the June 4, 2026 snapshot
What moved in Guadalupe Peaking Energy Center, LLC's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Guadalupe Peaking Energy Center, LLC's pipeline moves.
Guadalupe Peaking Energy Center, LLC against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Guadalupe Peaking Energy Center, LLC ranks 301 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 301 | Guadalupe Peaking Energy Center, LLC this page | 1 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Guadalupe Peaking Energy Center, LLCEvery Guadalupe Peaking Energy Center, LLC project
The one project with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both.
Get alerts for Guadalupe Peaking Energy Center, LLC
We email you when Guadalupe Peaking Energy Center, LLC adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Guadalupe Peaking Energy Center, LLC project, with its county, dates and queue status.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.