Power developer7 projects on record Data as of

GridStor has 6 planned power projects totaling 950.8 MW and 1 operating project totaling 60 MW in the FieldProspects database. 68% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 35 contacts at the company are on file.

950.8MW
planned, 6 projects
60MW
operating, 1 project
650MW
interconnection agreement signed, 68% of planned
250MW
under construction, 2 projects
0MW
past due, 0 projects
35
contacts on file
Map

Where GridStor's planned pipeline sits

Planned MW by state. The 4 largest states hold 950.8 MW of the 950.8 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas450.8 MW3 projects, 47% of planned
  2. Kansas200 MW1 project, 21% of planned
  3. Missouri200 MW1 project, 21% of planned
  4. Arizona100 MW1 project, 11% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
15.8MW planned

for every MW GridStor operates today. Battery Storage is most of the gap.

PlannedOperating
Battery Storage 950.8 MW
60 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage6950.8 MW160 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed650 MW, 68%
4 of 6 planned projects (67%)
Under construction250 MW, 26%
2 of 6 planned projects (33%)
Past due0 MW, 0%
0 of 6 planned projects (0%)
0% of GridStor's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of GridStor's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0200400600 Snapshot year 150 MW 2026 2027 2028 550.4 MW 2029
View as table
YearProjectsMW
20261150 MW
20271100 MW
20281150.4 MW
20293550.4 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

GridStor's planned MW leans on ERCOT, Southwest Power Pool (SPP) and Arizona Public Service. ERCOT alone holds 47% of it.

Figure 2

Planned MW by grid operator

6 planned projects

ERCOT 450.8 MW 3 projects
Southwest Power Pool (SPP) 400 MW 2 projects
Arizona Public Service 100 MW 1 project
View as table
GridPlanned projectsPlanned MW
ERCOT3450.8 MW
Southwest Power Pool (SPP)2400 MW
Arizona Public Service1100 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2023 was the biggest year.

0200400600 550.4 MW 2023 2024 2025
View as table
Queue yearProjectsMW
20233550.4 MW
202400 MW
20251150.4 MW
Source. 2 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in GridStor's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+1
project added, 100 MW
0
came online
1
cancelled, inactive or dropped
2
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: GridStorChange: any 6 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
6 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when GridStor's pipeline moves.

Request access

GridStor against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. GridStor ranks 180 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
180 GridStor this page 6
950.8 MW
1
60 MW
0.06

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus GridStor

35 people at GridStor

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 9 managers and 8 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

35 contacts

C-Suite 5
VP 11
Director 8
Manager 9
Senior 2
View as table
SeniorityContacts
C-Suite5
VP11
Director8
Manager9
Senior2
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 35 contacts
PersonTitleDepartmentSeniorityContact
35 contacts at GridStor for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every GridStor project

All 7 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: GridStorSort: MW, largest first 7 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
7 projects and 1 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 35 contacts.

Request access

Get alerts for GridStor

We email you when GridStor adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every GridStor project and the 35 people behind them.