GridStor
GridStor has 6 planned power projects totaling 950.8 MW and 1 operating project totaling 60 MW in the FieldProspects database. 68% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 35 contacts at the company are on file.
Where GridStor's planned pipeline sits
Planned MW by state. The 4 largest states hold 950.8 MW of the 950.8 MW.
for every MW GridStor operates today. Battery Storage is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Battery Storage | 6 | 950.8 MW | 1 | 60 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of GridStor's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 1 | 150 MW |
| 2027 | 1 | 100 MW |
| 2028 | 1 | 150.4 MW |
| 2029 | 3 | 550.4 MW |
Pipeline by grid and queue year
GridStor's planned MW leans on ERCOT, Southwest Power Pool (SPP) and Arizona Public Service. ERCOT alone holds 47% of it.
Planned MW by grid operator
6 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 3 | 450.8 MW |
| Southwest Power Pool (SPP) | 2 | 400 MW |
| Arizona Public Service | 1 | 100 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2023 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2023 | 3 | 550.4 MW |
| 2024 | 0 | 0 MW |
| 2025 | 1 | 150.4 MW |
Changes since the June 4, 2026 snapshot
What moved in GridStor's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when GridStor's pipeline moves.
GridStor against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. GridStor ranks 180 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 180 | GridStor this page | 6 | 1 | 0.06 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus GridStor35 people at GridStor
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 9 managers and 8 directors are where interconnection and procurement decisions start.
By seniority
35 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 5 |
| VP | 11 |
| Director | 8 |
| Manager | 9 |
| Senior | 2 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every GridStor project
All 7 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 35 contacts.
Get alerts for GridStor
We email you when GridStor adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every GridStor project and the 35 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.