Greenbelt Renewables

Power developer4 projects on record Data as of

Greenbelt Renewables has 4 planned power projects totaling 1.4 GW in the FieldProspects database and no operating project on record. 79% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 1 state and 2 technologies.

1.4GW
planned, 4 projects
0MW
operating, 0 projects
1.1GW
interconnection agreement signed, 79% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
1
state
Map

Where Greenbelt Renewables' planned pipeline sits

Planned MW by state. Everything sits in Texas.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas1.4 GW4 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
1.4 GWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Battery Storage 731 MW
none
Wind 634.9 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage2731 MW00 MW
Wind2634.9 MW00 MW

MW by technologyBattery Storage and Wind have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed1.1 GW, 79%
3 of 4 planned projects (75%)
Under construction0 MW, 0%
0 of 4 planned projects (0%)
Past due0 MW, 0%
0 of 4 planned projects (0%)
0% of Greenbelt Renewables' planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Greenbelt Renewables' planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0200400600 Snapshot year 522.1 MW 2026 2027 2028 2029
View as table
YearProjectsMW
20261522.1 MW
20271208.9 MW
20281352.6 MW
20291282.3 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Greenbelt Renewables' planned MW sits entirely in ERCOT.

Figure 2

Planned MW by grid operator

4 planned projects

ERCOT 1.4 GW 4 projects
View as table
GridPlanned projectsPlanned MW
ERCOT41.4 GW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2025 was the biggest year.

0200400600800 2023 2024 634.9 MW 2025
View as table
Queue yearProjectsMW
20231522.1 MW
20241208.9 MW
20252634.9 MW
Source. Every planned project has a queue date MW

Changes since the June 4, 2026 snapshot

What moved in Greenbelt Renewables' queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
1
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Greenbelt RenewablesChange: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when Greenbelt Renewables' pipeline moves.

Request access

Greenbelt Renewables against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Greenbelt Renewables ranks 113 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
113 Greenbelt Renewables this page 4
1.4 GW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Greenbelt Renewables

Every Greenbelt Renewables project

All 4 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Greenbelt RenewablesSort: MW, largest first 4 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
4 projects and 1.4 GW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Greenbelt Renewables

We email you when Greenbelt Renewables adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Greenbelt Renewables project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.