Greenbacker

Power developer51 projects on record Data as of

Greenbacker has 6 planned power projects totaling 149.5 MW and 45 operating projects totaling 495.4 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 96 contacts at the company are on file.

149.5MW
planned, 6 projects
495.4MW
operating, 45 projects
149.5MW
interconnection agreement signed, 100% of planned
14.5MW
under construction, 2 projects
0MW
past due, 0 projects
96
contacts on file
Map

Where Greenbacker's planned pipeline sits

Planned MW by state. The 3 largest states hold 149.5 MW of the 149.5 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Illinois112.5 MW3 projects, 75% of planned
  2. New York35 MW2 projects, 23% of planned
  3. Maine2 MW1 project, 1% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
0.3MW planned

for every MW Greenbacker operates today.

PlannedOperating
Solar 134.5 MW
347.9 MW
Battery Storage 15 MW
34.3 MW
Wind none
113.2 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar5134.5 MW40347.9 MW
Battery Storage115 MW334.3 MW
Wind00 MW2113.2 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed149.5 MW, 100%
6 of 6 planned projects (100%)
Under construction14.5 MW, 10%
2 of 6 planned projects (33%)
Past due0 MW, 0%
0 of 6 planned projects (0%)
0% of Greenbacker's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Greenbacker's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0255075100 Snapshot year 17 MW 2026 2027 100 MW 2028
View as table
YearProjectsMW
2026217 MW
2027232.5 MW
20282100 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Greenbacker's planned MW leans on PJM Interconnection, New York ISO (NYISO) and Midcontinent ISO (MISO). PJM Interconnection alone holds 67% of it.

Figure 2

Planned MW by grid operator

6 planned projects

PJM Interconnection 100 MW 2 projects
New York ISO (NYISO) 35 MW 2 projects
Midcontinent ISO (MISO) 12.5 MW 1 project
ISO New England 2 MW 1 project
View as table
GridPlanned projectsPlanned MW
PJM Interconnection2100 MW
New York ISO (NYISO)235 MW
Midcontinent ISO (MISO)112.5 MW
ISO New England12 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2019 was the biggest year.

020406080 2016 2017 2018 75 MW 2019
View as table
Queue yearProjectsMW
2016120 MW
2017140 MW
201800 MW
2019275 MW
Source. 2 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Greenbacker's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
1
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: GreenbackerChange: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when Greenbacker's pipeline moves.

Request access

Greenbacker against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Greenbacker ranks 574 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
574 Greenbacker this page 6
149.5 MW
45
495.4 MW
3.31

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Greenbacker

96 people at Greenbacker

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 39 managers and 8 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

96 contacts

C-Suite 6
Founder 1
Head 1
VP 27
Director 8
Manager 39
Senior 14
View as table
SeniorityContacts
C-Suite6
Founder1
Head1
VP27
Director8
Manager39
Senior14
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 96 contacts
PersonTitleDepartmentSeniorityContact
96 contacts at Greenbacker for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Greenbacker project

All 51 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: GreenbackerSort: MW, largest first 51 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
51 projects and 644.9 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 96 contacts.

Request access

Get alerts for Greenbacker

We email you when Greenbacker adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Greenbacker project and the 96 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.