FieldProspects

Green Power Energy

Power developer3 projects on record Data as of

Green Power Energy has 3 planned power projects totaling 7.2 MW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 10 contacts at the company are on file.

7.2MW
planned, 3 projects
0MW
operating, 0 projects
7.2MW
interconnection agreement signed, 100% of planned
7.2MW
under construction, 3 projects
0MW
past due, 0 projects
10
contacts on file
Map

Where Green Power Energy's planned pipeline sits

Planned MW by state. Everything sits in New York.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. New York7.2 MW3 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
7.2 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Wind 7.2 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Wind37.2 MW00 MW

MW by technologyWind has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed7.2 MW, 100%
3 of 3 planned projects (100%)
Under construction7.2 MW, 100%
3 of 3 planned projects (100%)
Past due0 MW, 0%
0 of 3 planned projects (0%)
0% of Green Power Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Green Power Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
02468 Snapshot year 2026 2027 2028 7.2 MW 2029
View as table
YearProjectsMW
202600 MW
202700 MW
202800 MW
202937.2 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Green Power Energy's planned MW sits entirely in New York ISO (NYISO).

Figure 2

Planned MW by grid operator

3 planned projects

New York ISO (NYISO) 7.2 MW 3 projects
View as table
GridPlanned projectsPlanned MW
New York ISO (NYISO)37.2 MW

Changes since the June 4, 2026 snapshot

What moved in Green Power Energy's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
2
cancelled, inactive or dropped
0
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Green Power EnergyChange: any 2 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
2 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Green Power Energy's pipeline moves.

Request access

Green Power Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Green Power Energy ranks 757 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
757 Green Power Energy this page 3
7.2 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Green Power Energy

10 people at Green Power Energy

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 1 manager and 4 directors are where interconnection and procurement decisions start.

Figure 3

By seniority

10 contacts

VP 4
Director 4
Manager 1
Senior 1
View as table
SeniorityContacts
VP4
Director4
Manager1
Senior1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 10 contacts
PersonTitleDepartmentSeniorityContact
10 contacts at Green Power Energy for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Green Power Energy project

All 3 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Green Power EnergySort: MW, largest first 3 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
3 projects and 7.2 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 10 contacts.

Request access

Get alerts for Green Power Energy

We email you when Green Power Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Green Power Energy project and the 10 people behind them.