FieldProspects

Green Key Solar

Power developer5 projects on record Data as of

Green Key Solar has 5 operating power projects totaling 16.5 MW in the FieldProspects database and no planned project in any queue. 7 contacts at the company are on file. The projects sit in 2 states and 1 technology. Solar is its largest technology by capacity.

0MW
planned, 0 projects
16.5MW
operating, 5 projects
2
states
1
technology
7
contacts on file
Map

Where Green Key Solar's operating fleet sits

Operating MW by state. The 2 largest states hold 16.5 MW of the 16.5 MW.

none operating under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Illinois12.5 MW3 projects, 76% of operating
  2. Oregon4 MW2 projects, 24% of operating
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
16.5 MWoperating

and nothing planned in any queue. All of it is already built.

PlannedOperating
Solar none
16.5 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar00 MW516.5 MW

MW by technologyPlanned and operating MW

Green Key Solar against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. Green Key Solar has no planned project on record, so it sits below every developer in this table.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
Green Key Solar this page 0
0 MW
5
16.5 MW
no planned MW

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Green Key Solar

7 people at Green Key Solar

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 3 managers and 1 director are where interconnection and procurement decisions start.

Figure 1

By seniority

7 contacts

Founder 1
Director 1
Manager 3
Senior 2
View as table
SeniorityContacts
Founder1
Director1
Manager3
Senior2
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 7 contacts
PersonTitleDepartmentSeniorityContact
7 contacts at Green Key Solar for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Green Key Solar project

All 5 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Green Key SolarSort: MW, largest first 5 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
5 projects and 16.5 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 7 contacts.

Request access

Get alerts for Green Key Solar

We email you when Green Key Solar adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Green Key Solar project and the 7 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.