FieldProspects

Goldman Sachs Renewable Power

Power developer2 projects on record Data as of

Goldman Sachs Renewable Power has 2 planned power projects totaling 196.8 MW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 100% is past its listed in-service date. The projects sit in 1 state and 2 technologies.

196.8MW
planned, 2 projects
0MW
operating, 0 projects
196.8MW
interconnection agreement signed, 100% of planned
0MW
under construction, 0 projects
196.8MW
past due, 2 projects
1
state
Map

Where Goldman Sachs Renewable Power's planned pipeline sits

Planned MW by state. Everything sits in California.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. California196.8 MW2 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
196.8 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Solar 123 MW
none
Battery Storage 73.8 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar1123 MW00 MW
Battery Storage173.8 MW00 MW

MW by technologySolar and Battery Storage have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed196.8 MW, 100%
2 of 2 planned projects (100%)
Under construction0 MW, 0%
0 of 2 planned projects (0%)
Past due196.8 MW, 100%
2 of 2 planned projects (100%)
100% of Goldman Sachs Renewable Power's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Goldman Sachs Renewable Power's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
050100150200 Snapshot year 196.8 MW 2025 2026
View as table
YearProjectsMW
20252196.8 MW
202600 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Goldman Sachs Renewable Power's planned MW sits entirely in California ISO (CAISO).

Figure 2

Planned MW by grid operator

2 planned projects

California ISO (CAISO) 196.8 MW 2 projects
View as table
GridPlanned projectsPlanned MW
California ISO (CAISO)2196.8 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2007 was the biggest year.

050100150200 196.8 MW 2007
View as table
Queue yearProjectsMW
20072196.8 MW
Source. Every planned project has a queue date MW

Goldman Sachs Renewable Power against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Goldman Sachs Renewable Power ranks 529 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
529 Goldman Sachs Renewable Power this page 2
196.8 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Goldman Sachs Renewable Power

Every Goldman Sachs Renewable Power project

All 2 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Goldman Sachs Renewable PowerSort: MW, largest first 2 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
2 projects and 196.8 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Goldman Sachs Renewable Power

We email you when Goldman Sachs Renewable Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Goldman Sachs Renewable Power project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.