Glenvale Solar
Glenvale Solar has 12 planned power projects totaling 310.3 MW in the FieldProspects database and no operating project on record. 52% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 8 contacts at the company are on file.
Where Glenvale Solar's planned pipeline sits
Planned MW by state. The 2 largest states hold 310.3 MW of the 310.3 MW.
Largest states
- Maine306.3 MW11 projects, 99% of planned
- Connecticut4 MW1 project, 1% of planned
and no operating project on record yet. Everything here is pipeline.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 11 | 310.3 MW | 0 | 0 MW |
| Solar + Storage (Hybrid) | 1 | 0 MW | 0 | 0 MW |
MW by technologySolar and Solar + Storage (Hybrid) have no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Glenvale Solar's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 0 | 0 MW |
| 2027 | 5 | 76.4 MW |
| 2028 | 6 | 216.8 MW |
| 2029 | 1 | 17.1 MW |
Pipeline by grid and queue year
Glenvale Solar's planned MW sits entirely in ISO New England.
Planned MW by grid operator
12 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ISO New England | 12 | 310.3 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2020 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2019 | 1 | 17.1 MW |
| 2020 | 2 | 90.9 MW |
| 2021 | 2 | 53.3 MW |
| 2022 | 1 | 0 MW |
Changes since the June 4, 2026 snapshot
What moved in Glenvale Solar's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Glenvale Solar's pipeline moves.
Glenvale Solar against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Glenvale Solar ranks 379 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 379 | Glenvale Solar this page | 12 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Glenvale Solar8 people at Glenvale Solar
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 2 managers and 3 directors are where interconnection and procurement decisions start.
By seniority
8 contacts
View as table
| Seniority | Contacts |
|---|---|
| Founder | 1 |
| Director | 3 |
| Manager | 2 |
| Senior | 2 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Glenvale Solar project
All 12 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 8 contacts.
Get alerts for Glenvale Solar
We email you when Glenvale Solar adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Glenvale Solar project and the 8 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.