Glass Mountain Solar, LLC
Glass Mountain Solar, LLC has 4 planned power projects totaling 1.2 GW in the FieldProspects database and no operating project on record. 0% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 1 state and 1 technology.
Where Glass Mountain Solar, LLC's planned pipeline sits
Planned MW by state. Everything sits in Texas.
Largest states
- Texas1.2 GW4 projects, 100% of planned
and no operating project on record yet. Everything here is pipeline.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 4 | 1.2 GW | 0 | 0 MW |
MW by technologySolar has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Glass Mountain Solar, LLC's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 0 | 0 MW |
| 2027 | 0 | 0 MW |
| 2028 | 0 | 0 MW |
| 2029 | 4 | 1.2 GW |
Pipeline by grid and queue year
Glass Mountain Solar, LLC's planned MW sits entirely in ERCOT.
Planned MW by grid operator
4 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 4 | 1.2 GW |
When the planned projects entered the queue
Planned MW by queue request year. 2025 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2025 | 3 | 905.4 MW |
| 2026 | 1 | 302.7 MW |
Changes since the June 4, 2026 snapshot
What moved in Glass Mountain Solar, LLC's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Glass Mountain Solar, LLC's pipeline moves.
Glass Mountain Solar, LLC against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Glass Mountain Solar, LLC ranks 138 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 138 | Glass Mountain Solar, LLC this page | 4 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Glass Mountain Solar, LLCEvery Glass Mountain Solar, LLC project
All 4 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both.
Get alerts for Glass Mountain Solar, LLC
We email you when Glass Mountain Solar, LLC adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Glass Mountain Solar, LLC project, with its county, dates and queue status.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.