Generate Capital
Generate Capital has 17 planned power projects totaling 162.4 MW and 56 operating projects totaling 200.9 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 115 contacts at the company are on file.
Where Generate Capital's planned pipeline sits
Planned MW by state. The 3 largest states hold 162.4 MW of the 162.4 MW.
for every MW Generate Capital operates today. Battery Storage is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Battery Storage | 2 | 100 MW | 1 | 1.4 MW |
| Solar | 15 | 62.4 MW | 55 | 199.5 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Generate Capital's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 12 | 55.4 MW |
| 2027 | 3 | 7 MW |
| 2028 | 0 | 0 MW |
| 2029 | 2 | 100 MW |
Pipeline by grid and queue year
Generate Capital's planned MW leans on PJM Interconnection, New York ISO (NYISO) and Midcontinent ISO (MISO). PJM Interconnection alone holds 67% of it.
Planned MW by grid operator
17 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| PJM Interconnection | 4 | 109.5 MW |
| New York ISO (NYISO) | 6 | 27.9 MW |
| Midcontinent ISO (MISO) | 7 | 25 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2019 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2019 | 1 | 50 MW |
| 2020 | 1 | 50 MW |
Changes since the June 4, 2026 snapshot
What moved in Generate Capital's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Generate Capital's pipeline moves.
Generate Capital against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Generate Capital ranks 557 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 557 | Generate Capital this page | 17 | 56 | 1.24 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Generate Capital115 people at Generate Capital
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 33 managers and 19 directors are where interconnection and procurement decisions start.
By seniority
115 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 9 |
| Partner | 1 |
| Head | 11 |
| VP | 17 |
| Director | 19 |
| Manager | 33 |
| Senior | 25 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Generate Capital project
All 73 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 115 contacts.
Get alerts for Generate Capital
We email you when Generate Capital adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Generate Capital project and the 115 people behind them.