FieldProspects

Geenex

Power developer2 projects on record Data as of

Geenex has 2 planned power projects totaling 570 MW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 1 state and 2 technologies.

570MW
planned, 2 projects
0MW
operating, 0 projects
570MW
interconnection agreement signed, 100% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
1
state
Map

Where Geenex's planned pipeline sits

Planned MW by state. Everything sits in Indiana.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Indiana570 MW2 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
570 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Solar 450 MW
none
Solar + Storage (Hybrid) 120 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar1450 MW00 MW
Solar + Storage (Hybrid)1120 MW00 MW

MW by technologySolar and Solar + Storage (Hybrid) have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed570 MW, 100%
2 of 2 planned projects (100%)
Under construction0 MW, 0%
0 of 2 planned projects (0%)
Past due0 MW, 0%
0 of 2 planned projects (0%)
0% of Geenex's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Geenex's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0200400600 Snapshot year 2026 2027 2028 570 MW 2029
View as table
YearProjectsMW
202600 MW
202700 MW
202800 MW
20292570 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Geenex's planned MW sits entirely in PJM Interconnection.

Figure 2

Planned MW by grid operator

2 planned projects

PJM Interconnection 570 MW 2 projects
View as table
GridPlanned projectsPlanned MW
PJM Interconnection2570 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2020 was the biggest year.

0200400600 570 MW 2020
View as table
Queue yearProjectsMW
20202570 MW
Source. Every planned project has a queue date MW

Geenex against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Geenex ranks 261 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
261 Geenex this page 2
570 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Geenex

Every Geenex project

All 2 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: GeenexSort: MW, largest first 2 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
2 projects and 570 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Geenex

We email you when Geenex adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Geenex project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.