FieldProspects

Forefront Power

Power developer27 projects on record Data as of

Forefront Power has 3 planned power projects totaling 6 MW and 24 operating projects totaling 65.5 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 61 contacts at the company are on file.

6MW
planned, 3 projects
65.5MW
operating, 24 projects
6MW
interconnection agreement signed, 100% of planned
6MW
under construction, 3 projects
0MW
past due, 0 projects
61
contacts on file
Map

Where Forefront Power's planned pipeline sits

Planned MW by state. Everything sits in Illinois.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Illinois6 MW3 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
0.1MW planned

for every MW Forefront Power operates today.

PlannedOperating
Solar 6 MW
64.5 MW
Battery Storage none
1 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar36 MW2364.5 MW
Battery Storage00 MW11 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed6 MW, 100%
3 of 3 planned projects (100%)
Under construction6 MW, 100%
3 of 3 planned projects (100%)
Past due0 MW, 0%
0 of 3 planned projects (0%)
0% of Forefront Power's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Forefront Power's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0246 Snapshot year 6 MW 2026
View as table
YearProjectsMW
202636 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Forefront Power's planned MW sits entirely in Midcontinent ISO (MISO).

Figure 2

Planned MW by grid operator

3 planned projects

Midcontinent ISO (MISO) 6 MW 3 projects
View as table
GridPlanned projectsPlanned MW
Midcontinent ISO (MISO)36 MW

Changes since the June 4, 2026 snapshot

What moved in Forefront Power's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+3
projects added, 6 MW
0
came online
0
cancelled, inactive or dropped
0
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Forefront PowerChange: any 3 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
3 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Forefront Power's pipeline moves.

Request access

Forefront Power against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Forefront Power ranks 758 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
758 Forefront Power this page 3
6 MW
24
65.5 MW
10.92

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Forefront Power

61 people at Forefront Power

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 36 managers and 11 directors are where interconnection and procurement decisions start.

Figure 3

By seniority

61 contacts

C-Suite 5
Head 3
VP 4
Director 11
Manager 36
Senior 2
View as table
SeniorityContacts
C-Suite5
Head3
VP4
Director11
Manager36
Senior2
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 61 contacts
PersonTitleDepartmentSeniorityContact
61 contacts at Forefront Power for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Forefront Power project

All 27 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Forefront PowerSort: MW, largest first 27 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
27 projects and 71.5 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 61 contacts.

Request access

Get alerts for Forefront Power

We email you when Forefront Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Forefront Power project and the 61 people behind them.