Evergy
Evergy has 5 planned power projects totaling 868 MW and 4 operating projects totaling 17.6 MW in the FieldProspects database. 42% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 2 states and 1 technology.
Where Evergy's planned pipeline sits
Planned MW by state. Everything sits in Kansas.
Largest states
- Kansas868 MW5 projects, 100% of planned
for every MW Evergy operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 5 | 868 MW | 4 | 17.6 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Evergy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 0 | 0 MW |
| 2027 | 0 | 0 MW |
| 2028 | 0 | 0 MW |
| 2029 | 5 | 868 MW |
Pipeline by grid and queue year
Evergy's planned MW sits entirely in Southwest Power Pool (SPP).
Planned MW by grid operator
5 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| Southwest Power Pool (SPP) | 5 | 868 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2023 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2022 | 3 | 368 MW |
| 2023 | 2 | 500 MW |
Changes since the June 4, 2026 snapshot
What moved in Evergy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Evergy's pipeline moves.
Evergy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Evergy ranks 191 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 191 | Evergy this page | 5 | 4 | 0.02 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus EvergyEvery Evergy project
All 9 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both.
Get alerts for Evergy
We email you when Evergy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Evergy project, with its county, dates and queue status.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.