FieldProspects

Eurowind Energy

Power developer3 projects on record Data as of

Eurowind Energy has 3 planned power projects totaling 1.2 GW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 1 contact at the company are on file.

1.2GW
planned, 3 projects
0MW
operating, 0 projects
1.2GW
interconnection agreement signed, 100% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
1
contacts on file
Map

Where Eurowind Energy's planned pipeline sits

Planned MW by state. Everything sits in California.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. California1.2 GW3 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
1.2 GWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Solar 410 MW
none
Wind 408.8 MW
none
Battery Storage 405.9 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar1410 MW00 MW
Wind1408.8 MW00 MW
Battery Storage1405.9 MW00 MW

MW by technology3 technologies have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed1.2 GW, 100%
3 of 3 planned projects (100%)
Under construction0 MW, 0%
0 of 3 planned projects (0%)
Past due0 MW, 0%
0 of 3 planned projects (0%)
0% of Eurowind Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Eurowind Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
05001k1.5k Snapshot year 2026 2027 1.2 GW 2028
View as table
YearProjectsMW
202600 MW
202700 MW
202831.2 GW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Eurowind Energy's planned MW sits entirely in California ISO (CAISO).

Figure 2

Planned MW by grid operator

3 planned projects

California ISO (CAISO) 1.2 GW 3 projects
View as table
GridPlanned projectsPlanned MW
California ISO (CAISO)31.2 GW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2020 was the biggest year.

05001k1.5k 1.2 GW 2020
View as table
Queue yearProjectsMW
202031.2 GW
Source. Every planned project has a queue date MW

Eurowind Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Eurowind Energy ranks 134 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
134 Eurowind Energy this page 3
1.2 GW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Eurowind Energy

1 person at Eurowind Energy

Contacts with title, seniority, department, email and LinkedIn, counted here and never named.

Figure 4

By seniority

1 contact

VP 1
View as table
SeniorityContacts
VP1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 1 contact
PersonTitleDepartmentSeniorityContact
1 contact at Eurowind Energy for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Eurowind Energy project

All 3 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Eurowind EnergySort: MW, largest first 3 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
3 projects and 1.2 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 1 contact.

Request access

Get alerts for Eurowind Energy

We email you when Eurowind Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Eurowind Energy project and the 1 person behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.