ET Fuels US Inc.
ET Fuels US Inc. has 3 planned power projects totaling 200 MW in the FieldProspects database and no operating project on record. 0% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 1 state and 3 technologies.
Where ET Fuels US Inc.'s planned pipeline sits
Planned MW by state. Everything sits in Texas.
Largest states
- Texas200 MW3 projects, 100% of planned
and no operating project on record yet. Everything here is pipeline.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Wind | 1 | 200 MW | 0 | 0 MW |
| Battery Storage | 1 | 0 MW | 0 | 0 MW |
| Solar | 1 | 0 MW | 0 | 0 MW |
MW by technology3 technologies have no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of ET Fuels US Inc.'s planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 0 | 0 MW |
| 2027 | 0 | 0 MW |
| 2028 | 0 | 0 MW |
| 2029 | 3 | 200 MW |
Pipeline by grid and queue year
ET Fuels US Inc.'s planned MW sits entirely in ERCOT.
Planned MW by grid operator
3 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 3 | 200 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2025 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2025 | 3 | 200 MW |
ET Fuels US Inc. against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. ET Fuels US Inc. ranks 510 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 510 | ET Fuels US Inc. this page | 3 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus ET Fuels US Inc.Every ET Fuels US Inc. project
All 3 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both.
Get alerts for ET Fuels US Inc.
We email you when ET Fuels US Inc. adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every ET Fuels US Inc. project, with its county, dates and queue status.